You don't have javascript enabled. Good luck with that.
Pencarian
Saluran Penghubung Jalan Pademangan V Dikuras

Crossing Channel at Pademangan V Dredged

Personnel of Pademangan Sub-district Water Resource, South Jakarta, dredged crossing channel at Pademangan V, RW 01, Pademangan Timur Urban Village.

The channel is shallowing due to mud and waste

Implementer Head, Dewi Marlina, admitted the dredging is based on resident's request.

Damaged Manhole Cover at Pasar Minggu Underpass Repaired

"The channel is shallowing due to mud and waste. It triggers inundation during rain," he said, Tuesday (3/5).

She added that personnel started the dredging from Gang 28 up to Gang 29 along 30 meters.

"Channel's width is three meters and height is 130 centimeters," she added.

There are nine personnel deployed to dredge the channel by using manual tools.

"The dredging has been started since end of February and is targeted to complete this month," she added.

Meanwhile, one of RT 11/01 residents, Munasir (56), appreciated the dredging run by the personnel.

"The mud is too thick and disturbed the water flow. It is hoped the newly dredged channel will eliminate inundation during rain," he hoped

Linked News
Popular News indeks
  1. Jakarta Government Guarantees Full Medical Care for Bantargebang Landslide Victims

    access_time09-03-2026 remove_red_eye1301 personDessy Suciati
  2. Commission E Supports Restricting Children's Access to Social Media

    access_time09-03-2026 remove_red_eye1131 personFakhrizal Fakhri
  3. Affordable and High-Quality Staple Goods Offered at Ramadan Bazaar

    access_time09-03-2026 remove_red_eye842 personAldi Geri Lumban Tobing
  4. Governor Attends Melasti Ceremony at Segara Temple

    access_time15-03-2026 remove_red_eye476 personBudhi Firmansyah Surapati
  5. Travelers Departing from Lebak Bulus Terminal Starting to Increase

    access_time13-03-2026 remove_red_eye298 personTiyo Surya Sakti