You don't have javascript enabled. Good luck with that.
Pencarian
Jalan di Jakbar Butuh Perbaikan

A Year, Jalan Zainul Arifin Not Yet Repaired

Jalan Zainal Arifin, Tanah Sereal, Tambora, West Jakarta near the Ketapang Police Post is severe damaged. The residents who want to pass the road should be very cautious to avoid accident. The related agencies are expected to repair the road immediately.

But, the repair will be focused on potholes and continuing last year's postponed repair

Beritajakarta.com observation, the road along 30 meter looks damaged with potholes of 30 centimeter length and 40 centimeter width. Besides that, there also a pothole with 1 meter length and 10 meter width with the depth of 10-30 centimeters. The damage is also seen on Jalan Tanah Sereal Raya alongside Krukut River from RW 07, 10 and 13.

Rudiyanto (47), a RW 13 resident, Tanah Sereal Urban Village said, the road had damaged for one year. “The road has never been asphalted anymore, the city only cover the potholes," told Rudiyanto, Friday (4/17).

City to Improve Road Damage in N. Jakarta

Jakarta Bina Marga Department Head, Yusmada told, the road repair program in West Jakarta will be conducted after the budget is disbursed.

"But, the repair will be focused on potholes and continuing last year's postponed repair," told Yusmada.

Not only that, told Yusmada, his side will also add the number of inspection road as the beginning step to unravel congestion.

Linked News
Popular News indeks
  1. Jakarta Taps MSMEs and Creative Economy to Secure Global Top 50 Spot

    access_time11-07-2026 remove_red_eye1696 personAldi Geri Lumban Tobing
  2. Ciliwung River Normalization Accelerated, Pramono Ensures Land Acquisition Without Intermediaries

    access_time10-07-2026 remove_red_eye1476 personDessy Suciati
  3. Blocked Drain on Jalan Palmerah Utara is Being Repaired

    access_time10-07-2026 remove_red_eye1333 personFolmer
  4. Pramono will Take Firm Action Against Individuals Involved in Extortion

    access_time13-07-2026 remove_red_eye1116 personDessy Suciati
  5. The Pegangsaan Dua-Manggarai LRT Project Reaches 95 Percent Completion

    access_time14-07-2026 remove_red_eye808 personDessy Suciati