You don't have javascript enabled. Good luck with that.
Pencarian
Perbaikan Tujuh Bak Kontrol di Pulau Pramuka Rampung

Seven Control Boxes Repair on Pramuka Island Completed

Seribu Island Water Resource Sub-agency has completed the repair of seven control boxes on Pramuka Island, RT 04/05, Panggang Island Urban Village, Seribu Utara Island Sub-district.

Hopefully there will be no more inundation

Seribu Island Water Resource Sub-agency Head, Hendri said the repair of control boxes involved 10 personnel.

New Water Channel Constructed on Jalan Menceng Raya

The repair started on April 23 and completed on April 27, 2024," he said, Monday (4/29).

He added that the control box size has diameter of 40x40 cm and depth 50 cm. It is connected to other boxes by using six inch PVC pipe.

"The work included welding the frame, plastering and replacing the control box cover," he added.

According to him, Pramuka Island has more than 70 control boxes to filter sediment in the channel and to store rain water.

Meanwhile, RW 05 Head, Panggang Island Urban Village, Sairan appreciated than thanked all side for repairing the control box.

"Previously, the area was often inundated since the water overflowed from the control box. Hopefully there will be no more inundation after this," he stated.

Linked News
Popular News indeks
  1. Water Channel on Jalan SPG 7 Being Improved

    access_time18-09-2026 remove_red_eye772 personNurito
  2. Jakarta Govt Fully Backs Kanye West's Ye Live in Jakarta 2026

    access_time16-09-2026 remove_red_eye510 personDessy Suciati
  3. Jakarta Pushes to Strengthen Food Ecosystem

    access_time18-09-2026 remove_red_eye383 personAldi Geri Lumban Tobing
  4. 5M Movement Promoted to Create an Organized Utility Network

    access_time18-09-2026 remove_red_eye362 personFakhrizal Fakhri
  5. Pramono Departs for New York to Discuss Climate and Food Crises

    access_time18-09-2026 remove_red_eye360 personDessy Suciati