You don't have javascript enabled. Good luck with that.
Pencarian
Ada Pembangunan JPO, Dishub Rekayasa Lalin Jalan KH. Mas Mansyur

Pedestrian Bridge Construction, Traffic on Jalan KH Mas Mansyur Rearranged

Jakarta Transportation Agency conduct traffic engineering on Jalan KH Mas Mansyur, Central Jakarta related with pedestrian bridge construction.

Traffic engineering is applied based on project stages

Jakarta Transportation Agency Head, Syafrin Liputo, said the project is run on Jalan KH Mas Mansyur, west side of Citywalk Sudirman Jakarta.

"Traffic engineering is applied based on project stages," he said, Tuesday (7/23).

Here are the traffic engineering applied on Jalan KH Mas Mansyur;

a. installation of base plate on July 17, 2024 at 11 PM to 4 AM; The installation on Jalan KH Mas Mansyur, east side of Citywalk Sudirman Jakarta leaving one lane, west side of Jalan KH Mas Mansyur remains normal.

b. Material unloading on July 18-20 July, 2024 at 11 PM to 4 AM; Girder unloading is on east side of Jalan KH Mas Mansyur by leaving one lane on the side of Citywalk Sudirman Jakarta, west side of Jalan Mas Mansyur remains normal.

c. Main column erection on July 17 and 19, 2024 at 11 PM to 4 AM; The project is on east and west side of Jalan KH Mas Mansyur. The project will leave one lane.

d. Concreting column on July 20, 2024 at 11 PM to 4 AM; the project is on east and west side of Jalan KH Mas Mansyur. The project will leave one lane.

e. Connecting girder on July 20 to 22, 2024 at 11 PM to 4 AM;  Connecting girder 2 and 3 is on east side of Jalan KH Mas Mansyur by leaving one lane.

f. Main girder erection on July 22-23, 2024 at 11 PM to 4 AM; Main girder erection connects west and east side column will rearrange traffic as follows;

1) Traffic from Semanggi Heading Tanah Abang will go through: Jalan Jenderal Sudirman-Jalan Karet Pasar Baru Timur3-Jalan Karet Pasar Baru Timur 2-Jalan RM Margono Djoyohadikoesoemo;

2) Traffic from Casablanca heading Tanah Abang through: Jalan Jenderal Sudirman-take turn at Semanggi-Jalan Jenderal Sudirman-Jalan Karet Pasar Baru3-Jalan Karet;

3) Traffic from Penjernihan heading to Jalan Prof Dr Satrio through: Jalan RM Margono Pasar Baru Timur 2-Jalan RM Margono Djoyohadikoesoemo; RM Djoyohadikoesoemo-Jalan Galunggung-take u turn-Jalan Jenderal Sudirman-Jalan Prof Dr Satrio;

4) Traffic from Tanah Abang heading to Jalan Prof Dr Satrio through: Jalan RM Margono Djoyohadikoesoemo-Jalan Galunggung- take u turn-Jalan Jendral Sudirman-Jalan Prof Dr Satrio

g) Stair and lift erection on July 24 at 11 PM to 4 AM

"I appeal to road users to stay away from the project area and obey the traffic engineering applied," he stated.

Linked News
Popular News indeks
  1. Indonesia-Singapore Match: 80 Dishub Personnel Deployed to Manage Traffic Around GBK

    access_time25-09-2026 remove_red_eye588 personAldi Geri Lumban Tobing
  2. Jakarta International Stadium Sets Up Transit Schemes for The Weeknd Concert

    access_time24-09-2026 remove_red_eye472 personAldi Geri Lumban Tobing
  3. Jakarta Calls on Residents to Save Energy with 60-Minute Lights-Off Action

    access_time19-09-2026 remove_red_eye432 personAldi Geri Lumban Tobing
  4. South Jakarta BPBD Distributes 44,000 Liters of Clean Water

    access_time19-09-2026 remove_red_eye370 personTiyo Surya Sakti
  5. Jakarta Inspectorate Partners with KPK to Foster Early Anti-Corruption Culture

    access_time20-09-2026 remove_red_eye321 personFolmer