You don't have javascript enabled. Good luck with that.
Pencarian
Penataan Trotoar di Jalan Meruya Ilir dan Srengseng Raya Rampung

Sidewalk Arrangement on Jalan Meruya Ilir and Srengseng Raya Completed

West Jakarta Bina Marga Sub-agency has completed the sidewalk arrangement on Jalan Meruya Ilir and Jalan Srengseng Raya, Kembangan Sub-district.

has been completed since 10 days ago

West Jakarta Bina Marga Sub-agency's Road and Bridge Section Head, Khairul Imam, said the sidewalk arrangement on both roads were run along 800 meters and 1.5 meter width with total budget Rp 2 billion.

"The arrangement has been completed since 10 days ago based on the target," he said, Tuesday (7/30).

Sidewalk Border on Jalan Puri Kembangan Improved

Khairul added that both roads now have street furniture and guiding block. Street furniture includes public light, park benches and road safety posts.

Guntur Wijaya (55), resident of RT 04/07, Srengseng Urban Village, appreciated the sidewalk arrangement on both locations.

"Now pedestrian feels comfort while walking on the sidewalk," he admitted.

Linked News
Popular News indeks
  1. Cilandak Drainage Upgraded to Mitigate Flooding

    access_time27-01-2026 remove_red_eye870 personTiyo Surya Sakti
  2. TransJabodetabek Expansion, a Strategic Step to Increase Public Transportation Use

    access_time26-01-2026 remove_red_eye428 personFakhrizal Fakhri
  3. South Jakarta Tackles 38 Dengue Cases to Prevent Outbreak

    access_time02-02-2026 remove_red_eye425 personTiyo Surya Sakti
  4. Jakarta Prepares OMC and 200 Excavators to Prevent Flood

    access_time26-01-2026 remove_red_eye372 personDessy Suciati
  5. Jakarta Showers to Make Way for Partly Cloudy Skies

    access_time30-01-2026 remove_red_eye361 personDessy Suciati
close