You don't have javascript enabled. Good luck with that.
Pencarian
 Perbaikan Saluran Air di Lubang Buaya Rampung

Channel Repairs in Lubang Buaya Completed

The repair of the six-meter water channel on Jalan Pagelarang, RW 03 Lubang Buaya, Cipayung, East Jakarta, carried out on January 30, completed.

The work process takes a week

Cipayung Sub-district Water Resources (SDA) Executing Unit Head, Dian Kartika expressed repairs were made, as the channel was severely damaged. If left unchecked, it would trigger flooding during rain.

According to her, it was done by installing a new 50x50-centimeter U-ditch concrete complete with its cover concrete.

118 Pothole Points in Senen Repaired

"The work process takes a week," she expressed, Thursday (2/6).

It involved eight personnel and one heavy equipment type mini crane car.

"The installation of the U-ditch and its cover is done manually," he closed.

Linked News
Popular News indeks
  1. Jakarta Announces Rp 1 Fare for Transjakarta, MRT, and LRT on August 17

    access_time13-08-2026 remove_red_eye893 personAldi Geri Lumban Tobing
  2. Abdul Muis Building Fire Response Nears Completion, No Fatalities Reported

    access_time08-08-2026 remove_red_eye600 personAldi Geri Lumban Tobing
  3. Pramono Urges MUI to Strengthen Synergy in Maintaining Jakarta’s Harmony

    access_time12-08-2026 remove_red_eye575 personDessy Suciati
  4. Jakarta Ensures Public Services Stay Operational After Abdul Muis Building Fire

    access_time08-08-2026 remove_red_eye566 personFakhrizal Fakhri
  5. Fire Site in Utan Kayu Utara Being Cleared

    access_time11-08-2026 remove_red_eye427 personNurito