You don't have javascript enabled. Good luck with that.
Pencarian
Perbaikan Turap di Jalan Komplek Polri Rampung

Water Channel Retaining Wall Repair on Jalan Komplek Polri Completed

The repair of water channel retaining wall on Jalan Komplek Polri, RT 08/02, Karet Semanggi Urban Village, Setiabudi District, South Jakarta is completed.

Hopefully the water will flow smoothly now

Setiabudi District's Water Resource Implementer Unit Coordinator, Mursani said the retaining wall repair was done based on local resident's request.

Arranging Slum RWs, Pramono Focuses on Improving Basic Infrastructure

"We firstly dredged the mud before repairing the retaining wall," he said, Monday (5/19).

He added that the six Blue Taskforce personnel were deployed to repair retaining wall along 80 meters since April 8, 2025.

"Now the channel is also covered with a plate for the sake of resident's safety," he added.

He hopes the dredging and retaining wall repair will make the surround area free from inundation during rainy season.

Meanwhile, one of the residents, Pujo (45) appreciated the repair. He stated that the area was inundated during heavy rain.

"Hopefully the water will flow smoothly now," he stated.

Linked News
Popular News indeks
  1. Jakarta Calls on Residents to Save Energy with 60-Minute Lights-Off Action

    access_time19-09-2026 remove_red_eye425 personAldi Geri Lumban Tobing
  2. Indonesia-Singapore Match: 80 Dishub Personnel Deployed to Manage Traffic Around GBK

    access_time25-09-2026 remove_red_eye414 personAldi Geri Lumban Tobing
  3. Jakarta International Stadium Sets Up Transit Schemes for The Weeknd Concert

    access_time24-09-2026 remove_red_eye404 personAldi Geri Lumban Tobing
  4. South Jakarta BPBD Distributes 44,000 Liters of Clean Water

    access_time19-09-2026 remove_red_eye362 personTiyo Surya Sakti
  5. Jakarta Inspectorate Partners with KPK to Foster Early Anti-Corruption Culture

    access_time20-09-2026 remove_red_eye308 personFolmer