You don't have javascript enabled. Good luck with that.
Pencarian
Proses pemasangan beton u-ditch ke dalam saluran air di Lubang Buaya

Water Channel on Jalan Rawa Binong Being Improved

As many as 15 joint personnel are deployed to revitalize water channel on Jalan Rawa Binong, RT 01/10, Lubang Buaya, Cipayung District, East Jakarta.

This condition surely triggers inundation

Head Section of Economy and Development of Lubang Buaya Urban Village, Emi Wahyuni said the channel needs to be improved since the existing was not able to flow the water well.

Collapsed Channel Retaining Wall in Boulevard Timur Repaired

"This condition surely triggers inundation during rain," she said, Thursday (11/6).

She explained the channel revitalization is run along 85 meters by installing 120x100 cm u-ditch.

According to her, the work involves 15 personnel PPSU and Water Resources taskforce. One mini excavator is also deployed to accelerate the work.

"The work has been running since October 29, 2025 and is targeted for completion at the end of November," she explained.

Meanwhile, one of the local residents, Wahyu (49), appreciated the channel revitalization.

"Hopefully the revitalization can be completed on target," he hoped.

Linked News
Popular News indeks
  1. Jakarta Govt-City Council Step Up Coordination to Address Key Urban Challenges

    access_time22-02-2026 remove_red_eye1399 personFakhrizal Fakhri
  2. Free Transit Card Applications Skyrocket 143%, Passing 76k Mark

    access_time20-02-2026 remove_red_eye992 personAldi Geri Lumban Tobing
  3. CNY 2577 Kongzili: Matakin Calls for Justice and Solidarity

    access_time22-02-2026 remove_red_eye866 personAldi Geri Lumban Tobing
  4. Jalan RS Fatmawati Widening Supports Transit-Oriented Development

    access_time19-02-2026 remove_red_eye726 personTiyo Surya Sakti
  5. One-Year Reflection: Pram-Rano Outline Performance Achievements

    access_time21-02-2026 remove_red_eye649 personDessy Suciati