You don't have javascript enabled. Good luck with that.
Pencarian
Sudin SDA Jakpus Rampungkan Normalisasi Saluran Air di Jalan Sayuti

Channel Normalization on Jalan Sayuti Completed

The normalization of water channel ln Jalan Sayuti, RW 05, Rawasari, Cempaka Putih, run by Central Jakarta Water Resources Sub-agency since September 26, 2025, is now completed.

completed on December 31

Head of Central Jakarta Water Resources Sub-agency, Citrin Indriati said This 537 meter long channel was normalized using 60 x 60 centimeter U-ditch concrete.

Coastal Residents in Jakarta Urged to Be Alert for Tidal Flooding

"The normalization work involved 23 blue personnel. The project was completed on December 31," she said, Monday (1/5).

She is optimistic the channel will solve inundation that often happens at RW 05 of Rawasari area.

"We urge residents not to throw rubbish into the drains to prevent blockages," she appealed.

Meanwhile, Sigit (38), resident of RW 05 of Rawasari, admitted the newly improved water channel works well.

"There is no inundation in the area," he admitted.

Linked News
Popular News indeks
  1. Jakarta Govt-City Council Step Up Coordination to Address Key Urban Challenges

    access_time22-02-2026 remove_red_eye1399 personFakhrizal Fakhri
  2. Free Transit Card Applications Skyrocket 143%, Passing 76k Mark

    access_time20-02-2026 remove_red_eye992 personAldi Geri Lumban Tobing
  3. CNY 2577 Kongzili: Matakin Calls for Justice and Solidarity

    access_time22-02-2026 remove_red_eye866 personAldi Geri Lumban Tobing
  4. Jalan RS Fatmawati Widening Supports Transit-Oriented Development

    access_time19-02-2026 remove_red_eye739 personTiyo Surya Sakti
  5. One-Year Reflection: Pram-Rano Outline Performance Achievements

    access_time21-02-2026 remove_red_eye650 personDessy Suciati