You don't have javascript enabled. Good luck with that.
Pencarian
Akan Dibangun RPTRA, Status Taman Volker Masih Belum Jelas

Land Claimmed by PT KAI, Park Construction Delayed

The attempt of North Jakarta Administration constructing Child-Friendly Public Spaces (RPTRA) in Karapan Sapi Park or Volker Park meets an obstacle. It is because, PT Kereta Api Indonesia (KAI) claimmed the 25 hectare land.

It is still under investigation by Park and Cemetery Department and Head of Local Management Assets (KPAD)

“It is still under investigation by Park and Cemetery Department and Head of Local Management Assets (KPAD). Since PT KAI claimmed that land is theirs,” said Head of Public and Women Empowerment for North Jakarta Social Welfare, Tuti Kusnaeni, Wednesday (7/29).

RPTRA must Be Sterile from Thug, Ahok Says

According to her, PT Pelindo who is acting as funder of Corporate Social Responsibility (CSR) for RPTRA’s construction, requesting clarity Volker park status. The effort aims to prevent any obstacles found during the construction.

Meanwhile, Head of North Jakarta Local Management Asset, Bakti Irawan acknowledged that North Jakarta National Land Agency (BPN) revealed that indeed there is a certificate issued belongs to PT KAI No.71/1988 against 25,976 square meters land.

“That’s the latest information from BPN.  We will back to coordinate with BPN related the visual of 25 hectare land,” he uttered.

Besides, his side will re-investigate over inventory data that being reported by North Jakarta Park and Cemetery Sub-Department regarding the status of 3.3 hectare leasing land area in Volker Park.

“If PT KAI willing to rent that land to City Administration then we will process the administration, or we will find other locations,” he disclosed.

Linked News
Popular News indeks
  1. 129 Motorcycle Parked Illegally in Daan Mogot Controlled

    access_time08-11-2026 remove_red_eye703 personBudhi Firmansyah Surapati
  2. Kampung Melayu Sports Facility Inaugurated to Tackle Brawls

    access_time06-11-2026 remove_red_eye664 personDessy Suciati
  3. Jakarta to Develop Its First Mangrove Botanical Garden

    access_time06-11-2026 remove_red_eye662 personDessy Suciati
  4. Aid for Fire Survivors at Pinus Elok Flats Has Been Distributed

    access_time06-11-2026 remove_red_eye629 personNurito
  5. Kampung Rambutan 1 Reservoir to Combine Flood Control with Public Recreation

    access_time06-11-2026 remove_red_eye625 personAldi Geri Lumban Tobing