You don't have javascript enabled. Good luck with that.
Pencarian
Jalan Layang di Kebayoran Baru Rampung 22,27 Persen

Flyover Project in Kebayoran Baru Reached 22.27 Percent

The Transjakarta corridor XIII Ciledug - Kapten P Tendean flyover development keeps accelerated, especially around Taman Puring, Kebayoran Baru, South Jakarta. Box girder lifting will be done this month.

The contractor will lift the box girder this mid-September

"The contractor will lift the box girder this mid-September," said Heru Suwondo, Head of Overpass and Intersection for Jakarta Bina Marga, Tuesday (9/8).

According to him, the flyover development has reached 22.27 percent out of target 18.39 percent.

Ciledug-Tendean Flyover Construction Has Reached 22 Percent

"I hope other contractors for other flyover packages will do the same thing," he stated.

Linked News
Popular News indeks
  1. Jakarta Provincial Government Receives a Grant of Rp 9.6 Billion in KPK`s Seized Assets

    access_time20-10-2026 remove_red_eye1376 personDessy Suciati
  2. Jakarta Pushed for Education Equity to Retain Top Student City Rank

    access_time19-10-2026 remove_red_eye918 personFakhrizal Fakhri
  3. Jakarta Esports 2026: Celebrating Local Games, Music and More

    access_time19-10-2026 remove_red_eye736 personAldi Geri Lumban Tobing
  4. Dengue Cases Decline in Jakarta as Prevention Efforts Intensify

    access_time16-10-2026 remove_red_eye566 personAldi Geri Lumban Tobing
  5. CiLung Festival Lets Visitors Ride Boats Made from Recycled Plastic Bottles

    access_time16-10-2026 remove_red_eye546 personAldi Geri Lumban Tobing