Normalization Project in Tegal Amba Connecting Channel Accelerated
access_time October 22 2015 11:15 AM remove_red_eye 2493
Reported by Aldi Geri Lumban Tobing | Translated by Trias Risangayu
Reported by Aldi Geri Lumban Tobing | Translated by Trias Risangayu
East Jakarta Water Management Sub-Department continues to accelerately normalizing connecting channels in Tegal Amba, Duren Sawit. That is by deploying two heavy equipements type long arm and amphibian.
We send 30 officers and have been divided into two shifts
Head of East Jakarta Water Management Sub-Department, Yazied Bustomi targets the normalization work to be complete by end of November.
“We send 30 officers and
have been divided into two shifts,” he told, Wednesday (10/21).Marunda Connecting Channel Drained as Flood MitigationBustomi acknowledged the work has been running over 5 days. "To smoothen it, officers had to demolish a small bridge and a house," he expressed.
Bustomi added the dredge soil is put on two vacant lands belongs to Az-Ziyadah Pesantren.
“Another location is right behind Tegal Amba channel, we’ve coordinated with Duren Sawit Sub-District Head,” he disclosed.