You don't have javascript enabled. Good luck with that.
Pencarian
DKI Ambil Alih Pengelolaan Parkir Kawasan PIK

PT MRT Required to Provide Parking Area in Each Station

Jakarta Technical Management Unit (UPT) of Parking for Dept. of Transportation asked PT Mass Rapid Transit (MRT) preparing parking lot in each station and shed.

MRT people must have the park and ride design

Sunardi Sinaga, UPT's head, said that the parking lot must be designed from now to avoid new problem.

Mass Transport Projects Disturbed Transjakarta Bus Head Way

"MRT people must have the park and ride design," he said, Thursday (11/12).

According to him, the shed at Fatmawati will be full with passengers since the area is close with Tangerang. Adequate parking lot must be prepared.

"Park and ride is needed to anticipate the movement from private to public transport. The width could be adjusted with the passenger number in every station or shed," he disclosed.

Linked News
Popular News indeks
  1. Jakarta Taps MSMEs and Creative Economy to Secure Global Top 50 Spot

    access_time11-07-2026 remove_red_eye1700 personAldi Geri Lumban Tobing
  2. Ciliwung River Normalization Accelerated, Pramono Ensures Land Acquisition Without Intermediaries

    access_time10-07-2026 remove_red_eye1476 personDessy Suciati
  3. Blocked Drain on Jalan Palmerah Utara is Being Repaired

    access_time10-07-2026 remove_red_eye1333 personFolmer
  4. Pramono will Take Firm Action Against Individuals Involved in Extortion

    access_time13-07-2026 remove_red_eye1117 personDessy Suciati
  5. The Pegangsaan Dua-Manggarai LRT Project Reaches 95 Percent Completion

    access_time14-07-2026 remove_red_eye810 personDessy Suciati