You don't have javascript enabled. Good luck with that.
Pencarian
DKI Ambil Alih Pengelolaan Parkir Kawasan PIK

PT MRT Required to Provide Parking Area in Each Station

Jakarta Technical Management Unit (UPT) of Parking for Dept. of Transportation asked PT Mass Rapid Transit (MRT) preparing parking lot in each station and shed.

MRT people must have the park and ride design

Sunardi Sinaga, UPT's head, said that the parking lot must be designed from now to avoid new problem.

Mass Transport Projects Disturbed Transjakarta Bus Head Way

"MRT people must have the park and ride design," he said, Thursday (11/12).

According to him, the shed at Fatmawati will be full with passengers since the area is close with Tangerang. Adequate parking lot must be prepared.

"Park and ride is needed to anticipate the movement from private to public transport. The width could be adjusted with the passenger number in every station or shed," he disclosed.

Linked News
Popular News indeks
  1. Cilandak Drainage Upgraded to Mitigate Flooding

    access_time27-01-2026 remove_red_eye869 personTiyo Surya Sakti
  2. TransJabodetabek Expansion, a Strategic Step to Increase Public Transportation Use

    access_time26-01-2026 remove_red_eye425 personFakhrizal Fakhri
  3. Jakarta Prepares OMC and 200 Excavators to Prevent Flood

    access_time26-01-2026 remove_red_eye371 personDessy Suciati
  4. Jakarta Showers to Make Way for Partly Cloudy Skies

    access_time30-01-2026 remove_red_eye359 personDessy Suciati
  5. Several Microtrans Routes Diverted

    access_time31-01-2026 remove_red_eye358 personAldi Geri Lumban Tobing
close