You don't have javascript enabled. Good luck with that.
Pencarian
DKI Ambil Alih Pengelolaan Parkir Kawasan PIK
.
photo Yopie Oscar - Beritajakarta.id

PT MRT Required to Provide Parking Area in Each Station

Jakarta Technical Management Unit (UPT) of Parking for Dept. of Transportation asked PT Mass Rapid Transit (MRT) preparing parking lot in each station and shed.

MRT people must have the park and ride design

Sunardi Sinaga, UPT's head, said that the parking lot must be designed from now to avoid new problem.

Mass Transport Projects Disturbed Transjakarta Bus Head Way

"MRT people must have the park and ride design," he said, Thursday (11/12).

According to him, the shed at Fatmawati will be full with passengers since the area is close with Tangerang. Adequate parking lot must be prepared.

"Park and ride is needed to anticipate the movement from private to public transport. The width could be adjusted with the passenger number in every station or shed," he disclosed.

Linked News
Popular News indeks
  1. MSMEs Bazaar Held at Binus Anggrek Campus

    access_time30-10-2024 remove_red_eye966 personTP Moan Simanjuntak
  2. 250 High School Students in N. Jakarta Learn to Create Digital Content

    access_time01-11-2024 remove_red_eye778 personBudhi Firmansyah Surapati
  3. 18 School Principals Participate in Public Agency E-Monev Presentation

    access_time02-11-2024 remove_red_eye445 personFolmer
  4. South Jakarta City Government Accelerates Stop BABS

    access_time31-10-2024 remove_red_eye410 personTiyo Surya Sakti
  5. Tanah Tinggi Residents Participate in Computer Operator Training

    access_time02-11-2024 remove_red_eye351 personBudhi Firmansyah Surapati