You don't have javascript enabled. Good luck with that.
Pencarian
DKI Ambil Alih Pengelolaan Parkir Kawasan PIK

PT MRT Required to Provide Parking Area in Each Station

Jakarta Technical Management Unit (UPT) of Parking for Dept. of Transportation asked PT Mass Rapid Transit (MRT) preparing parking lot in each station and shed.

MRT people must have the park and ride design

Sunardi Sinaga, UPT's head, said that the parking lot must be designed from now to avoid new problem.

Mass Transport Projects Disturbed Transjakarta Bus Head Way

"MRT people must have the park and ride design," he said, Thursday (11/12).

According to him, the shed at Fatmawati will be full with passengers since the area is close with Tangerang. Adequate parking lot must be prepared.

"Park and ride is needed to anticipate the movement from private to public transport. The width could be adjusted with the passenger number in every station or shed," he disclosed.

Linked News
Popular News indeks
  1. Open for All: Jakarta City Hall Welcomes Visitors for Namu Balai Kota

    access_time03-10-2026 remove_red_eye718 personDessy Suciati
  2. Transjakarta Reaffirms Ban on Busking in Mikrotrans and Bus Stops

    access_time02-10-2026 remove_red_eye531 personAldi Geri Lumban Tobing
  3. Jakarta Builds Five New Animal Health Centers to Expand Veterinary Services

    access_time30-09-2026 remove_red_eye530 personAldi Geri Lumban Tobing
  4. 1,500 Runners and Pets Hit the Track for World Rabies Day Run 2026

    access_time03-10-2026 remove_red_eye521 personAnita Karyati
  5. Commission D Supports Reserve Fund for Long-Term Infrastructure

    access_time02-10-2026 remove_red_eye505 personFakhrizal Fakhri