Irigasi Tengah River will Be Normalized Soon
access_time December 08 2015 01:56 PM remove_red_eye 1616
Reported by Aldi Geri Lumban Tobing | Translated by Trias Risangayu
Reported by Aldi Geri Lumban Tobing | Translated by Trias Risangayu
The river normalization is targeted to be done December 30
East Jakarta Sub-dept. of Water Management is about to normalize Irigasi Tengah River or Kalimalang, Cakung Barat.
Ahmad Yazied Bustomi, head of the agency, said that post demolishment of 268 illegal buildings at the location, his side will dredge the sediment and improve the plaster.
Normalization of Ciliwung River Reaches 40 Percent"The river normalization is targeted to be done December 30," he said Monday (12/7).
According to him, one heavy equipment is enough to assist the project. It is predicted that the project will not finish because of budget matter. In fact, his side tries to optimize the effort.
"It can be continued next year to dredge the entire river," he closed.