You don't have javascript enabled. Good luck with that.
Pencarian
Perbaikan Jalan Lingkungan di Jakbar Baru 60 Persen

Reparation of Neighborhood Road in W. Jakarta Keeps Being Accelerated

Until the end of December 2015, the repair for damaged neighborhood road that spread in 8 sub-districts in West Jakarta has reached 60 percent.

The road repair has reached 60 percent so far

"The road repair has reached 60 percent so far. Then the rest of the damaged roads is still being accelerated," said Head of West Jakarta Bina Marga Department, M Najib, Tuesday (12/29).

Jalan Rawasari Timur 1 will Be Widened

He continued most severe damaged road is found in  Cengkareng area. "The damage is due to passing heavy vehicles from the factories in Cengkareng area," he told.

Najib added, West Jakarta residents can sent complaint via email or come to West Jakarta Bina Marga Sub-Department on the 9th floor of Block B, Kembangan, West Jakarta.

Linked News
Popular News indeks
  1. May Day: Transjakarta Service Adjustments

    access_time01-05-2026 remove_red_eye768 personAldi Geri Lumban Tobing
  2. The Lights-Out Action Successfully Reduces Carbon Emissions

    access_time27-04-2026 remove_red_eye556 personAldi Geri Lumban Tobing
  3. MRT Jakarta Urged to Enhance Power Outage Mitigation System

    access_time27-04-2026 remove_red_eye545 personFakhrizal Fakhri
  4. City Deploys Massive Cleanup Force for May Day at Monas

    access_time01-05-2026 remove_red_eye507 personAldi Geri Lumban Tobing
  5. Dinkes Sets Up Health Posts for May Day Events

    access_time01-05-2026 remove_red_eye504 personDessy Suciati