You don't have javascript enabled. Good luck with that.
Pencarian
48 Saluran PHB di Jakbar akan Dikeruk

48 Channels in W. Jakarta Dredged

West Jakarta Sub-dept. of Water Management will dredge connecting channels this year. The mud inside the channel always decreasing the ability of channel flowing water.

All source will be deployed to prevent or handle flood

“There are 48 connecting channels to be dredged,” said Imron, head of agency, Saturday (1/16).

According to him, the targets are Citra 5, Jalan Ketapang, Taman Ratu, Maphar, Kedoya, Ring Road and Pogla connecting channels.

100 Sacks of Mud and Trash Picked Up from Krukut Riverbank

“The supporting tools are ready,” he added.

At this moment, the agency has 11 breaker units, 30 pump houses, nine mobile pumps, and nine trailer pumps.

“All source will be deployed to prevent or handle flood,” he closed.

Linked News
Popular News indeks
  1. Jakarta Taps MSMEs and Creative Economy to Secure Global Top 50 Spot

    access_time11-07-2026 remove_red_eye1589 personAldi Geri Lumban Tobing
  2. Ciliwung River Normalization Accelerated, Pramono Ensures Land Acquisition Without Intermediaries

    access_time10-07-2026 remove_red_eye1440 personDessy Suciati
  3. Blocked Drain on Jalan Palmerah Utara is Being Repaired

    access_time10-07-2026 remove_red_eye1303 personFolmer
  4. Jalan Kebon Kelapa I Repaved

    access_time07-07-2026 remove_red_eye1096 personNurito
  5. Pramono Inaugurates Mayapada Hospital to Improve Healthcare Services

    access_time09-07-2026 remove_red_eye967 personDessy Suciati