You don't have javascript enabled. Good luck with that.
Pencarian
48 Saluran PHB di Jakbar akan Dikeruk

48 Channels in W. Jakarta Dredged

West Jakarta Sub-dept. of Water Management will dredge connecting channels this year. The mud inside the channel always decreasing the ability of channel flowing water.

All source will be deployed to prevent or handle flood

“There are 48 connecting channels to be dredged,” said Imron, head of agency, Saturday (1/16).

According to him, the targets are Citra 5, Jalan Ketapang, Taman Ratu, Maphar, Kedoya, Ring Road and Pogla connecting channels.

100 Sacks of Mud and Trash Picked Up from Krukut Riverbank

“The supporting tools are ready,” he added.

At this moment, the agency has 11 breaker units, 30 pump houses, nine mobile pumps, and nine trailer pumps.

“All source will be deployed to prevent or handle flood,” he closed.

Linked News
Popular News indeks
  1. Suckermouth Catfish Control for Environmental Preservation

    access_time18-04-2026 remove_red_eye788 personFakhrizal Fakhri
  2. Jakarta to Hold Citywide Lights-Out Initiative

    access_time24-04-2026 remove_red_eye637 personAldi Geri Lumban Tobing
  3. Suckerfish Handling in South Jakarta is Run in Accordance with MUI Recommendations

    access_time21-04-2026 remove_red_eye628 personTiyo Surya Sakti
  4. Jakarta Newcomers Mostly in Productive Age

    access_time22-04-2026 remove_red_eye386 personAldi Geri Lumban Tobing
  5. East Jakarta Steps Up Services to Simplify Population Registration

    access_time20-04-2026 remove_red_eye361 personNurito