You don't have javascript enabled. Good luck with that.
Pencarian
Pengerjaan Fisik 19 Waduk Baru Ditarget Tahun Ini

19 Reservoirs Project Accelerated This Year

Jakarta Dept. of Water Management is ready to continue the neglected reservoir projects. Teguh Hendrawan, Jakarta Head Dept. of Water Management, said that his side targeted physical project to start this year.

We’ll surely continue this project

“19 new reservoir physical projects hopefully can start this year,” he said, Wednesday (1/20).

He added that those 19 reservoirs are spread in five administration areas. It is hoped the reservoir could save the water reserves during peak of rainy season next February-March.

Reservoir Construction is Continued, Basuki Says

“We’ll surely continue this project,” he closed.

Linked News
Popular News indeks
  1. Cilandak Drainage Upgraded to Mitigate Flooding

    access_time27-01-2026 remove_red_eye870 personTiyo Surya Sakti
  2. South Jakarta Tackles 38 Dengue Cases to Prevent Outbreak

    access_time02-02-2026 remove_red_eye489 personTiyo Surya Sakti
  3. TransJabodetabek Expansion, a Strategic Step to Increase Public Transportation Use

    access_time26-01-2026 remove_red_eye430 personFakhrizal Fakhri
  4. Jakarta Prepares OMC and 200 Excavators to Prevent Flood

    access_time26-01-2026 remove_red_eye373 personDessy Suciati
  5. Several Microtrans Routes Diverted

    access_time31-01-2026 remove_red_eye363 personAldi Geri Lumban Tobing
close