You don't have javascript enabled. Good luck with that.
Pencarian
Alami Pendangkalan, Dermaga Pulau Tidung Dikeruk

Tidung Island Dock Dredged

The Tidung Island Dock, South Seribu Islands that experiencing shallowing is currently under dredging process. Thus the passenger and department boats can return docked without queuing due to narrowing of the docking pier.

By dredging deeper, the boats can dock first before dropping off the passenger in the dock

"By dredging deeper, the boats can dock first before dropping off the passenger in the dock," expressed Surahman, Head of Tidung Island Urban Village, Wednesday (1/27).

According to him, all this time, the passenger has to jump from one boat to another boat to ride and get off the boat in Tidung Island Dock. As for the dredging process, expected to be completed within three months.

PKL in Tidung Islands to Be Managed

"It is predicted to be complete in three months thus overload passenger can be minimized," he stated.

The dock in Tidung Island is divided into two paths, especially for boats coming from the Kali Adem Dock and Rawasaban Dock, Tangerang, Banten. Both paths are now experiencing shallowing and narrowing, thus the boat queue in tourists visit season is high.

Linked News
Popular News indeks
  1. Jakarta Claims Rp 2.27 T in Public Assets from Developer Obligations

    access_time06-08-2026 remove_red_eye741 personDessy Suciati
  2. Abdul Muis Building Fire Response Nears Completion, No Fatalities Reported

    access_time08-08-2026 remove_red_eye569 personAldi Geri Lumban Tobing
  3. Jakarta Ensures Public Services Stay Operational After Abdul Muis Building Fire

    access_time08-08-2026 remove_red_eye530 personFakhrizal Fakhri
  4. Jakarta Remains Indonesia's Top Investment Destination

    access_time07-08-2026 remove_red_eye507 personAldi Geri Lumban Tobing
  5. Thousand Islands Conducts Vehicle Emission Tests on Three Islands

    access_time07-08-2026 remove_red_eye502 personAnita Karyati