You don't have javascript enabled. Good luck with that.
Pencarian
Alami Pendangkalan, Dermaga Pulau Tidung Dikeruk
.
photo Suparni - Beritajakarta.id

Tidung Island Dock Dredged

The Tidung Island Dock, South Seribu Islands that experiencing shallowing is currently under dredging process. Thus the passenger and department boats can return docked without queuing due to narrowing of the docking pier.

By dredging deeper, the boats can dock first before dropping off the passenger in the dock

"By dredging deeper, the boats can dock first before dropping off the passenger in the dock," expressed Surahman, Head of Tidung Island Urban Village, Wednesday (1/27).

According to him, all this time, the passenger has to jump from one boat to another boat to ride and get off the boat in Tidung Island Dock. As for the dredging process, expected to be completed within three months.

PKL in Tidung Islands to Be Managed

"It is predicted to be complete in three months thus overload passenger can be minimized," he stated.

The dock in Tidung Island is divided into two paths, especially for boats coming from the Kali Adem Dock and Rawasaban Dock, Tangerang, Banten. Both paths are now experiencing shallowing and narrowing, thus the boat queue in tourists visit season is high.

Linked News
Popular News indeks
  1. MSMEs Bazaar Held at Binus Anggrek Campus

    access_time30-10-2024 remove_red_eye954 personTP Moan Simanjuntak
  2. 250 High School Students in N. Jakarta Learn to Create Digital Content

    access_time01-11-2024 remove_red_eye659 personBudhi Firmansyah Surapati
  3. Satpol PP Expels Illegal Participants at Sudirman - Thamrin CFD

    access_time27-10-2024 remove_red_eye454 personBudhi Firmansyah Surapati
  4. South Jakarta City Government Accelerates Stop BABS

    access_time31-10-2024 remove_red_eye395 personTiyo Surya Sakti
  5. Traffic Arrangement Applied on Jalan Tambak

    access_time28-10-2024 remove_red_eye370 personAldi Geri Lumban Tobing