You don't have javascript enabled. Good luck with that.
Pencarian
 Warga Kampung Pulo Berharap Normalisasi Ciliwung Dipercepat

Residents Ask Ciliwung Inspection Road Asphalted

The residents of Kampung Pulo, Kampung Melayu, Jatinegara, East Jakarta hoped the project of Ciliwung River normalization could be speed up. It is because the inspection road has already damaged and inundated due to passed by heavy vehicles.

All inspection road are damage

Mutmainah (50), one of the citizens, hoped the government will speed up the project to avoid worse road condition.

“All inspection road are damage. Government should pay attention on this,” she said, Tuesday (2/2).

Mobile Pump Alerted to Tackle Overflowing Waters of Ciliwung

She added that the road repair must be asphalted for better quality.

“Because of this project, this area is no longer flooded. Puddle also receded faster,” she admitted.

Linked News
Popular News indeks
  1. Transjakarta Resumes Operations with Strategic Service Adjustments

    access_time28-08-2026 remove_red_eye947 personAldi Geri Lumban Tobing
  2. JIF Summit 2026 Drives Global Partnerships and Investment Growth in Jakarta

    access_time28-08-2026 remove_red_eye664 personAldi Geri Lumban Tobing
  3. JITEX 2026: Fostering a Global Trade and Investment Ecosystem

    access_time01-09-2026 remove_red_eye540 personAldi Geri Lumban Tobing
  4. Transjakarta Commits to Accelerating Modal Integration and Fleet Electrification

    access_time31-08-2026 remove_red_eye538 personAldi Geri Lumban Tobing
  5. Drainage Normalization on Jalan Mandioli to Be Completed in October

    access_time28-08-2026 remove_red_eye487 personFolmer