Valve Installed on Water Channel to Block Overflowing Waters
access_time February 04 2016 01:46 PM remove_red_eye 1533
Reported by Nurito | Translated by Nugroho Adibrata
Reported by Nurito | Translated by Nugroho Adibrata
East Jakarta Administration is scheduled to install a valve on each end of the water channel in Kampung Pulo residential, Kampung Melayu. It is conducted to block the overflowing waters of Ciliwung River into the channel.
If the valve is installed, we will suck up the puddles using mobile pump. It can block overflowing waters of Ciliwung
Mayor of East Jakarta, Bambang Musyawardana disclosed, puddle comes out is due to unfinished normalization of Ciliwung River. Then the water flows to the channel.
"If the valve is installed, we will suck up the puddles using mobile pump. It can block overflowing waters of Ciliwung," he explained, Thursday (2/4).
Channel Normalization is Still ObstructedHe added, another effort is the channel will be installed with sandbags. The aim is the same.