You don't have javascript enabled. Good luck with that.
Pencarian
Saluran Air di Kampung Pulo akan Dipasang Katup

Valve Installed on Water Channel to Block Overflowing Waters

East Jakarta Administration is scheduled to install a valve on each end of the water channel in Kampung Pulo residential, Kampung Melayu. It is conducted to block the overflowing waters of Ciliwung River into the channel.

If the valve is installed, we will suck up the puddles using mobile pump. It can block overflowing waters of Ciliwung

Mayor of East Jakarta, Bambang Musyawardana disclosed, puddle comes out is due to unfinished normalization of Ciliwung River. Then the water flows to the channel.

"If the valve is installed, we will suck up the puddles using mobile pump. It can block overflowing waters of Ciliwung," he explained, Thursday (2/4).

Channel Normalization is Still Obstructed

He added, another effort is the channel will be installed with sandbags. The aim is the same.

Linked News
Popular News indeks
  1. City Council Strengthens Synergy with Central Legislators to Support Jakarta`s Development

    access_time30-07-2026 remove_red_eye1084 personFakhrizal Fakhri
  2. Jakarta Partners with Five Satellite Cities for Greater Jakarta Connected Initiative

    access_time30-07-2026 remove_red_eye610 personBudhi Firmansyah Surapati
  3. Still Rp 3,500! No Fare Change for Transjakarta’s Kalideres–Soetta Route

    access_time01-08-2026 remove_red_eye522 personAldi Geri Lumban Tobing
  4. Pramono Praises Young Innovators at the Jakarta Robotic Games 2026

    access_time28-07-2026 remove_red_eye502 personDessy Suciati
  5. Jakarta Reaffirms Commitment to Preserving Cultural Heritage

    access_time31-07-2026 remove_red_eye501 personDessy Suciati