You don't have javascript enabled. Good luck with that.
Pencarian
Saluran Air di Kampung Pulo akan Dipasang Katup
.
photo Istimewa - Beritajakarta.id

Valve Installed on Water Channel to Block Overflowing Waters

East Jakarta Administration is scheduled to install a valve on each end of the water channel in Kampung Pulo residential, Kampung Melayu. It is conducted to block the overflowing waters of Ciliwung River into the channel.

If the valve is installed, we will suck up the puddles using mobile pump. It can block overflowing waters of Ciliwung

Mayor of East Jakarta, Bambang Musyawardana disclosed, puddle comes out is due to unfinished normalization of Ciliwung River. Then the water flows to the channel.

"If the valve is installed, we will suck up the puddles using mobile pump. It can block overflowing waters of Ciliwung," he explained, Thursday (2/4).

Channel Normalization is Still Obstructed

He added, another effort is the channel will be installed with sandbags. The aim is the same.

Linked News
Popular News indeks
  1. Transjakarta Targets Planting 100,000 Mangroves

    access_time12-07-2025 remove_red_eye414 personBudhi Firmansyah Surapati
  2. Rano Karno Celebrates City's Anniversary with Kamal Residents

    access_time12-07-2025 remove_red_eye397 personFolmer
  3. Residents Enthusiastically Enjoy the Car Free Day in Kebayoran Lama

    access_time13-07-2025 remove_red_eye352 personTiyo Surya Sakti
  4. Traffic Engineering on Jalan Otista to Begin July 20 Due to JPO Revitalization

    access_time17-07-2025 remove_red_eye324 personAldi Geri Lumban Tobing
  5. MRT Jakarta Considers Route Expansion to South Tangerang

    access_time13-07-2025 remove_red_eye316 personAldi Geri Lumban Tobing

Hitung Mundur 22 Juni 2027

00
Hari
00
Jam
00
Menit
00
Detik