You don't have javascript enabled. Good luck with that.
Pencarian
Tidak Ada BBM, Alat Berat di Waduk Ria Rio

Ria Rio Dam Dredging Neglected for 2 Weeks

The dredging of Ria Rio dam, Kayu Putih Urban Village, Pulogadung, East Jakarta, is neglected. It is allegedly the fuel distribution harmed the project.

It’s been two weeks we have no diesel fuel distribution. But we stay here everyday

Based on Beritajakarta.com’s observation, there are seven heavy equipments at the scene. Those are six backhoe and one Water Master. Of seven backhoes, one of them can not be operated due to lost screen monitor, while other six backhoes are parked at the northern side.

Michael (27), one of operators, admitted that fuel distribution also hampered the project.

River and Dam Began to Be Dredged

“It’s been two weeks we have no diesel fuel distribution. But we stay here everyday,” he said, Monday (2/8).

According to him, the fuel in the heavy equipments is used to turn on the engine only. If operated, the engine will go off.

Linked News
Popular News indeks
  1. Jakarta Announces Rp 1 Fare for Transjakarta, MRT, and LRT on August 17

    access_time13-08-2026 remove_red_eye865 personAldi Geri Lumban Tobing
  2. Abdul Muis Building Fire Response Nears Completion, No Fatalities Reported

    access_time08-08-2026 remove_red_eye593 personAldi Geri Lumban Tobing
  3. Jakarta Ensures Public Services Stay Operational After Abdul Muis Building Fire

    access_time08-08-2026 remove_red_eye559 personFakhrizal Fakhri
  4. Pramono Urges MUI to Strengthen Synergy in Maintaining Jakarta’s Harmony

    access_time12-08-2026 remove_red_eye559 personDessy Suciati
  5. Jakarta Remains Indonesia's Top Investment Destination

    access_time07-08-2026 remove_red_eye524 personAldi Geri Lumban Tobing