You don't have javascript enabled. Good luck with that.
Pencarian
 Rencana Normalisasi Kali Semongol Akan Dilaksanakan Tahun Ini
.
photo Ilustrasi - Beritajakarta.id

Hundreds of Building Impacted with Semongol River Normalization

Kalideres Sub-district Head, Uus Kuswanto, said the river normalization plan will be realized this year. Based on data, 270 buildings are impacted with this project.

About 270 buildings are impacted with this normalization project

“About 270 buildings are impacted with this normalization project,” he said, Wednesday (2/24).

In the first stage, the arrangement would be held at the end of river or in RW 01.

Tegal Alur Residents Requested for Semongol River Dredging

“Pump will be installed to be flew into Tanjungan river. After that, sheet pile will be also installed,” he added.

He hoped flood in Tegal Alur could be overcome through this project.

Linked News
Popular News indeks
  1. 1,262 Personnel Ready to Support Bhayangkara Anniversary Cleanliness

    access_time30-06-2025 remove_red_eye584 personAldi Geri Lumban Tobing
  2. 4,072 Damaged Roads in Central Jakarta Have Been Repaired

    access_time04-07-2025 remove_red_eye353 personFolmer
  3. Dishub Pushes Digitization of Parking Management for Local Revenue

    access_time01-07-2025 remove_red_eye298 personFakhrizal Fakhri
  4. Transjabodetabek Bekasi-Galunggung Route Officially Operates

    access_time03-07-2025 remove_red_eye247 personDessy Suciati
  5. Pramono Asks for Onrust Island Tourism Potential to Be Optimized

    access_time04-07-2025 remove_red_eye247 personDessy Suciati

Hitung Mundur 22 Juni 2027

00
Hari
00
Jam
00
Menit
00
Detik