You don't have javascript enabled. Good luck with that.
Pencarian
 Rencana Normalisasi Kali Semongol Akan Dilaksanakan Tahun Ini

Hundreds of Building Impacted with Semongol River Normalization

Kalideres Sub-district Head, Uus Kuswanto, said the river normalization plan will be realized this year. Based on data, 270 buildings are impacted with this project.

About 270 buildings are impacted with this normalization project

“About 270 buildings are impacted with this normalization project,” he said, Wednesday (2/24).

In the first stage, the arrangement would be held at the end of river or in RW 01.

Tegal Alur Residents Requested for Semongol River Dredging

“Pump will be installed to be flew into Tanjungan river. After that, sheet pile will be also installed,” he added.

He hoped flood in Tegal Alur could be overcome through this project.

Linked News
Popular News indeks
  1. Water Channel on Jalan SPG 7 Being Improved

    access_time18-09-2026 remove_red_eye829 personNurito
  2. Jakarta Pushes to Strengthen Food Ecosystem

    access_time18-09-2026 remove_red_eye605 personAldi Geri Lumban Tobing
  3. Pramono Departs for New York to Discuss Climate and Food Crises

    access_time18-09-2026 remove_red_eye560 personDessy Suciati
  4. Operations of the MV Doulos Hope Ship Library Delayed

    access_time18-09-2026 remove_red_eye549 personAnita Karyati
  5. Sumenep Park Revitalization to Be Aligned with Gresik River Flow

    access_time18-09-2026 remove_red_eye455 personFolmer