You don't have javascript enabled. Good luck with that.
Pencarian
 Rencana Normalisasi Kali Semongol Akan Dilaksanakan Tahun Ini

Hundreds of Building Impacted with Semongol River Normalization

Kalideres Sub-district Head, Uus Kuswanto, said the river normalization plan will be realized this year. Based on data, 270 buildings are impacted with this project.

About 270 buildings are impacted with this normalization project

“About 270 buildings are impacted with this normalization project,” he said, Wednesday (2/24).

In the first stage, the arrangement would be held at the end of river or in RW 01.

Tegal Alur Residents Requested for Semongol River Dredging

“Pump will be installed to be flew into Tanjungan river. After that, sheet pile will be also installed,” he added.

He hoped flood in Tegal Alur could be overcome through this project.

Linked News
Popular News indeks
  1. BPBD Issues Alert Over Tidal Flooding in 12 Jakarta Coastal Areas

    access_time25-02-2026 remove_red_eye905 personAldi Geri Lumban Tobing
  2. Free Tattoo Removal at Sunda Kelapa Mosque Targets 100 Residents

    access_time24-02-2026 remove_red_eye859 personFolmer
  3. Jakarta Pavilion at TMII to Undergo Full Revitalization

    access_time24-02-2026 remove_red_eye612 personDessy Suciati
  4. Menteng Tenggulun Prepared as Culinary Tourism Site

    access_time25-02-2026 remove_red_eye555 personAldi Geri Lumban Tobing
  5. Semanggi Park Revitalization to Boost Jakarta's Appeal

    access_time23-02-2026 remove_red_eye475 personFakhrizal Fakhri