You don't have javascript enabled. Good luck with that.
Pencarian
 Rencana Normalisasi Kali Semongol Akan Dilaksanakan Tahun Ini
.
photo Ilustrasi - Beritajakarta.id

Hundreds of Building Impacted with Semongol River Normalization

Kalideres Sub-district Head, Uus Kuswanto, said the river normalization plan will be realized this year. Based on data, 270 buildings are impacted with this project.

About 270 buildings are impacted with this normalization project

“About 270 buildings are impacted with this normalization project,” he said, Wednesday (2/24).

In the first stage, the arrangement would be held at the end of river or in RW 01.

Tegal Alur Residents Requested for Semongol River Dredging

“Pump will be installed to be flew into Tanjungan river. After that, sheet pile will be also installed,” he added.

He hoped flood in Tegal Alur could be overcome through this project.

Linked News
Popular News indeks
  1. Takjil Supervision in Central Jakarta Begins Second Week

    access_time02-03-2025 remove_red_eye457 personBudhi Firmansyah Surapati
  2. Government Declares Ramadhan Starts on March 1, 2025

    access_time28-02-2025 remove_red_eye417 personBudhi Firmansyah Surapati
  3. Dishub: Lay Bay Remains Optimal to Support Public Transportation User Comfort

    access_time02-03-2025 remove_red_eye384 personAldi Geri Lumban Tobing
  4. Orderly Sidewalk Operation Targets Many Streets in Jakarta

    access_time27-02-2025 remove_red_eye375 personAldi Geri Lumban Tobing
  5. Traffic Diverted on Jalan Jatinegara Barat as Floods Hit Jakarta

    access_time04-03-2025 remove_red_eye341 personNurito

Hitung Mundur 22 Juni 2027

00
Hari
00
Jam
00
Menit
00
Detik