You don't have javascript enabled. Good luck with that.
Pencarian
 Rencana Normalisasi Kali Semongol Akan Dilaksanakan Tahun Ini
.
photo Ilustrasi - Beritajakarta.id

Hundreds of Building Impacted with Semongol River Normalization

Kalideres Sub-district Head, Uus Kuswanto, said the river normalization plan will be realized this year. Based on data, 270 buildings are impacted with this project.

About 270 buildings are impacted with this normalization project

“About 270 buildings are impacted with this normalization project,” he said, Wednesday (2/24).

In the first stage, the arrangement would be held at the end of river or in RW 01.

Tegal Alur Residents Requested for Semongol River Dredging

“Pump will be installed to be flew into Tanjungan river. After that, sheet pile will be also installed,” he added.

He hoped flood in Tegal Alur could be overcome through this project.

Linked News
Popular News indeks
  1. Commission D Legislator Supports Park Monitoring Optimization

    access_time20-01-2025 remove_red_eye1524 personDessy Suciati
  2. Realizing Food Self-Sufficiency, Jakarta Holds Simultaneous Planting Activity

    access_time21-01-2025 remove_red_eye943 personAldi Geri Lumban Tobing
  3. Gulkarmat to Intensify Fire Mitigation Education

    access_time22-01-2025 remove_red_eye473 personBudhi Firmansyah Surapati
  4. BMKG Warns of Potential High Rainfall in Jakarta

    access_time22-01-2025 remove_red_eye432 personDessy Suciati
  5. City and Kejati Forge Cooperation for Good Government Governance

    access_time21-01-2025 remove_red_eye412 personFolmer