You don't have javascript enabled. Good luck with that.
Pencarian
 Rencana Normalisasi Kali Semongol Akan Dilaksanakan Tahun Ini

Hundreds of Building Impacted with Semongol River Normalization

Kalideres Sub-district Head, Uus Kuswanto, said the river normalization plan will be realized this year. Based on data, 270 buildings are impacted with this project.

About 270 buildings are impacted with this normalization project

“About 270 buildings are impacted with this normalization project,” he said, Wednesday (2/24).

In the first stage, the arrangement would be held at the end of river or in RW 01.

Tegal Alur Residents Requested for Semongol River Dredging

“Pump will be installed to be flew into Tanjungan river. After that, sheet pile will be also installed,” he added.

He hoped flood in Tegal Alur could be overcome through this project.

Linked News
Popular News indeks
  1. 129 Motorcycle Parked Illegally in Daan Mogot Controlled

    access_time08-11-2026 remove_red_eye713 personBudhi Firmansyah Surapati
  2. Kampung Melayu Sports Facility Inaugurated to Tackle Brawls

    access_time06-11-2026 remove_red_eye674 personDessy Suciati
  3. Jakarta to Develop Its First Mangrove Botanical Garden

    access_time06-11-2026 remove_red_eye668 personDessy Suciati
  4. Aid for Fire Survivors at Pinus Elok Flats Has Been Distributed

    access_time06-11-2026 remove_red_eye636 personNurito
  5. Kampung Rambutan 1 Reservoir to Combine Flood Control with Public Recreation

    access_time06-11-2026 remove_red_eye633 personAldi Geri Lumban Tobing