You don't have javascript enabled. Good luck with that.
Pencarian
 Rencana Normalisasi Kali Semongol Akan Dilaksanakan Tahun Ini

Hundreds of Building Impacted with Semongol River Normalization

Kalideres Sub-district Head, Uus Kuswanto, said the river normalization plan will be realized this year. Based on data, 270 buildings are impacted with this project.

About 270 buildings are impacted with this normalization project

“About 270 buildings are impacted with this normalization project,” he said, Wednesday (2/24).

In the first stage, the arrangement would be held at the end of river or in RW 01.

Tegal Alur Residents Requested for Semongol River Dredging

“Pump will be installed to be flew into Tanjungan river. After that, sheet pile will be also installed,” he added.

He hoped flood in Tegal Alur could be overcome through this project.

Linked News
Popular News indeks
  1. Transjabodetabek PIK 2-Blok M Route Serves 1.4 Million Passengers

    access_time24-05-2026 remove_red_eye1838 personAldi Geri Lumban Tobing
  2. Kultura Market in Pademangan Barat Attracts Crowds

    access_time22-05-2026 remove_red_eye1120 personAnita Karyati
  3. West Jakarta to Host Career Day Walk-in Interviews Next Week

    access_time21-05-2026 remove_red_eye1063 personBudhi Firmansyah Surapati
  4. Inundation on DI Panjaitan Road Recede

    access_time20-05-2026 remove_red_eye878 personNurito
  5. Dharma Jaya Ready for Thousands of Eid al-Adha Sacrifices

    access_time20-05-2026 remove_red_eye709 personAldi Geri Lumban Tobing