You don't have javascript enabled. Good luck with that.
Pencarian
 Rencana Normalisasi Kali Semongol Akan Dilaksanakan Tahun Ini

Hundreds of Building Impacted with Semongol River Normalization

Kalideres Sub-district Head, Uus Kuswanto, said the river normalization plan will be realized this year. Based on data, 270 buildings are impacted with this project.

About 270 buildings are impacted with this normalization project

“About 270 buildings are impacted with this normalization project,” he said, Wednesday (2/24).

In the first stage, the arrangement would be held at the end of river or in RW 01.

Tegal Alur Residents Requested for Semongol River Dredging

“Pump will be installed to be flew into Tanjungan river. After that, sheet pile will be also installed,” he added.

He hoped flood in Tegal Alur could be overcome through this project.

Linked News
Popular News indeks
  1. Open for All: Jakarta City Hall Welcomes Visitors for Namu Balai Kota

    access_time03-10-2026 remove_red_eye755 personDessy Suciati
  2. Transjakarta Reaffirms Ban on Busking in Mikrotrans and Bus Stops

    access_time02-10-2026 remove_red_eye548 personAldi Geri Lumban Tobing
  3. 1,500 Runners and Pets Hit the Track for World Rabies Day Run 2026

    access_time03-10-2026 remove_red_eye543 personAnita Karyati
  4. Commission D Supports Reserve Fund for Long-Term Infrastructure

    access_time02-10-2026 remove_red_eye526 personFakhrizal Fakhri
  5. Jakarta Logs 0.13% Inflation as Chicken, Chili, and Rice Push Prices Up

    access_time03-10-2026 remove_red_eye507 personFakhrizal Fakhri