You don't have javascript enabled. Good luck with that.
Pencarian
 Rencana Normalisasi Kali Semongol Akan Dilaksanakan Tahun Ini

Hundreds of Building Impacted with Semongol River Normalization

Kalideres Sub-district Head, Uus Kuswanto, said the river normalization plan will be realized this year. Based on data, 270 buildings are impacted with this project.

About 270 buildings are impacted with this normalization project

“About 270 buildings are impacted with this normalization project,” he said, Wednesday (2/24).

In the first stage, the arrangement would be held at the end of river or in RW 01.

Tegal Alur Residents Requested for Semongol River Dredging

“Pump will be installed to be flew into Tanjungan river. After that, sheet pile will be also installed,” he added.

He hoped flood in Tegal Alur could be overcome through this project.

Linked News
Popular News indeks
  1. Immersive Room and Glowing Forest Attractions Enliven Eid at TMII

    access_time26-03-2026 remove_red_eye948 personFakhrizal Fakhri
  2. 292 East Jakarta Personnel Mobilized for Eid Return Rush

    access_time25-03-2026 remove_red_eye723 personNurito
  3. Jakarta Leaders Join Residents for Eid al-Fitr Prayer at City Hall

    access_time21-03-2026 remove_red_eye719 personFolmer
  4. Jakarta's Mudik to Jakarta Program Hits Rp21 Trillion in Transactions

    access_time25-03-2026 remove_red_eye710 personFakhrizal Fakhri
  5. 10 Transjakarta Amari Buses Operated at Kalideres Terminal

    access_time25-03-2026 remove_red_eye706 personTiyo Surya Sakti