You don't have javascript enabled. Good luck with that.
Pencarian
Alat Berat Dikerahkan untuk Penertiban Kalijodo

Heavy Equipment Sent for Executing Kalijodo

Dozens of heavy equipments type excavator are deployed to optimize execution process in Kalijodo, Monday (2/29).

We already standby since 11 PM

Based on Beritajakarta.com, there are at least 12 excavators sent to Jl Kepanduan II, ranging from North Jakarta until West Jakarta.

Not only that, two excavators type amphibious have also been sent to left and right side of river in such region.

Traffic Engineering Applied in Kalijodo

"We already standby since 11 PM," said Beri (28), one of excavator operator.

Linked News
Popular News indeks
  1. Water Channel on Jalan SPG 7 Being Improved

    access_time18-09-2026 remove_red_eye801 personNurito
  2. Jakarta Govt Fully Backs Kanye West's Ye Live in Jakarta 2026

    access_time16-09-2026 remove_red_eye539 personDessy Suciati
  3. Jakarta Pushes to Strengthen Food Ecosystem

    access_time18-09-2026 remove_red_eye514 personAldi Geri Lumban Tobing
  4. Pramono Departs for New York to Discuss Climate and Food Crises

    access_time18-09-2026 remove_red_eye425 personDessy Suciati
  5. Operations of the MV Doulos Hope Ship Library Delayed

    access_time18-09-2026 remove_red_eye422 personAnita Karyati