You don't have javascript enabled. Good luck with that.
Pencarian
Antisipasi Penumpukan Penumpang, Jaktim Siapkan Bus Sekolah

School Bus Prepared to Prevent the Buildup of Passengers

Related to demonstration from member of Transportation Driver United (PPAD), East Jakarta Transportation Sub-dept prepares school bus to prevent the buildup of passengers. 

Until 7 AM, there has been no the buildup of passengers report. If it happens, we will serve them immediately. The bus numbers is  tailored to the needs on the field

According to Bernard Octavianus, Head of East Jakarta Transportation Sub-dept, his sub-dept has coordinated with the School Transport Management Unit (Upas) to send school bus. But, so far, the buildup of passengers has not been seen.

"Until 7 AM, there has been no the buildup of passengers report. If it happens, we will serve them immediately. The bus numbers is  tailored to the needs on the field," he expressed, Monday (4/14).

Demonstration, Traffic on Jalan Merdeka Selatan Bogged Down

He added, the buildup of passengers-prone area is only in Pulogadung and Kampung Melayu terminals. Considering those demonstration departed from both terminals.

Linked News
Popular News indeks
  1. Water Channel on Jalan SPG 7 Being Improved

    access_time18-09-2026 remove_red_eye837 personNurito
  2. Jakarta Pushes to Strengthen Food Ecosystem

    access_time18-09-2026 remove_red_eye615 personAldi Geri Lumban Tobing
  3. Pramono Departs for New York to Discuss Climate and Food Crises

    access_time18-09-2026 remove_red_eye583 personDessy Suciati
  4. Operations of the MV Doulos Hope Ship Library Delayed

    access_time18-09-2026 remove_red_eye569 personAnita Karyati
  5. Sumenep Park Revitalization to Be Aligned with Gresik River Flow

    access_time18-09-2026 remove_red_eye463 personFolmer