You don't have javascript enabled. Good luck with that.
Pencarian
Antisipasi Penumpukan Penumpang, Jaktim Siapkan Bus Sekolah

School Bus Prepared to Prevent the Buildup of Passengers

Related to demonstration from member of Transportation Driver United (PPAD), East Jakarta Transportation Sub-dept prepares school bus to prevent the buildup of passengers. 

Until 7 AM, there has been no the buildup of passengers report. If it happens, we will serve them immediately. The bus numbers is  tailored to the needs on the field

According to Bernard Octavianus, Head of East Jakarta Transportation Sub-dept, his sub-dept has coordinated with the School Transport Management Unit (Upas) to send school bus. But, so far, the buildup of passengers has not been seen.

"Until 7 AM, there has been no the buildup of passengers report. If it happens, we will serve them immediately. The bus numbers is  tailored to the needs on the field," he expressed, Monday (4/14).

Demonstration, Traffic on Jalan Merdeka Selatan Bogged Down

He added, the buildup of passengers-prone area is only in Pulogadung and Kampung Melayu terminals. Considering those demonstration departed from both terminals.

Linked News
Popular News indeks
  1. Transjakarta Commits to Accelerating Modal Integration and Fleet Electrification

    access_time31-08-2026 remove_red_eye615 personAldi Geri Lumban Tobing
  2. JITEX 2026: Fostering a Global Trade and Investment Ecosystem

    access_time01-09-2026 remove_red_eye567 personAldi Geri Lumban Tobing
  3. Pramono Confirms Permanent Bridge to Be Built in Tegal Alur

    access_time29-08-2026 remove_red_eye464 personDessy Suciati
  4. Jakarta Fine Arts and Ceramics Museum Hosts Malangan Exhibition

    access_time29-08-2026 remove_red_eye461 personFakhrizal Fakhri
  5. Pramono Emphasizes Importance of Creative Spaces for Children

    access_time03-09-2026 remove_red_eye438 personDessy Suciati