You don't have javascript enabled. Good luck with that.
Pencarian
pemeriksaan jentik nyamuk

No PAM, RW 09 Pegadungan Prone to Dengue Fever Disease

Low maintenance on water reservoirs owned by residents of RW 09, Pegadungan Urban Village, Kalideres Sub-District, West Jakarta, has caused their neighborhood is very vulnerable to mosquito breeding and dengue fever disease.

Locals here had to accommodate rainwater in a container in their homes. As for the drinking water needs, is bought from a water carter. Therefore, we hope the PDAM to immediately install PAM channels in our residential

RW 09 Chairperson, Biriadi said that local residents had to accommodate rainwater in their homes, because residential areas have not been equipped by PAM. It surely triggers mosquitoes lay their eggs in the water reservoir.

"Locals here had to accommodate rainwater in a container in their homes. As for the drinking water needs, is bought from a water carter. Therefore, we hope the PDAM to immediately install PAM channels in our residential," he expected, Tuesday (4/15).

Dengue Fever in W. Jakarta Remains High

Responding on this matter, Kalideres Sub-District Head, Ahmad Ya'la expressed his side would check the location next week. Regarding mosquitoes problem during activity of anti-mosquito campaign (PSN), he also often conducts socialization by mounting stickers to each home.

"We will send a letter to the PDAM soon about PAM channels installation. If not, dengue disease would be rampant," he stressed.

When being confirmed about this matter via cell phone, Palyja Public Relation, Meyrita Maryani could not be contacted.

Linked News
Popular News indeks
  1. Jakarta Taps MSMEs and Creative Economy to Secure Global Top 50 Spot

    access_time11-07-2026 remove_red_eye1710 personAldi Geri Lumban Tobing
  2. Ciliwung River Normalization Accelerated, Pramono Ensures Land Acquisition Without Intermediaries

    access_time10-07-2026 remove_red_eye1481 personDessy Suciati
  3. Blocked Drain on Jalan Palmerah Utara is Being Repaired

    access_time10-07-2026 remove_red_eye1335 personFolmer
  4. Pramono will Take Firm Action Against Individuals Involved in Extortion

    access_time13-07-2026 remove_red_eye1120 personDessy Suciati
  5. The Pegangsaan Dua-Manggarai LRT Project Reaches 95 Percent Completion

    access_time14-07-2026 remove_red_eye816 personDessy Suciati