You don't have javascript enabled. Good luck with that.
Pencarian
Dinas Tata Air Bangun Sumur Resapan di SMAN 8
.
photo Aldi Geri Lumban Tobing - Beritajakarta.id

Absorption Well Provided at SMAN 8

Besides providing temporary water bin as deep as two meters, Jakarta Dept. of Water Management will also provide absorption well and biopore holes at SMAN 8, Bukit Duri, Tebet, South Jakarta.

The school is not completed with absorption well and biopore holes

“The school is not completed with absorption well and biopore holes. We’re working on it now,” said Teguh Hendarwan, Jakarta Head Dept. of Water Management, Monday (4/4).

According to him, the project could take less than a week.

SMAN 8 Prepares Flood Scenario

“We also placing sand sacks in front of school building to hold water from Ciliwung river,” he added.

Linked News
Popular News indeks
  1. Cilandak Drainage Upgraded to Mitigate Flooding

    access_time27-01-2026 remove_red_eye866 personTiyo Surya Sakti
  2. TransJabodetabek Expansion, a Strategic Step to Increase Public Transportation Use

    access_time26-01-2026 remove_red_eye422 personFakhrizal Fakhri
  3. Jakarta Prepares OMC and 200 Excavators to Prevent Flood

    access_time26-01-2026 remove_red_eye369 personDessy Suciati
  4. Jakarta Showers to Make Way for Partly Cloudy Skies

    access_time30-01-2026 remove_red_eye354 personDessy Suciati
  5. Pramono: Jakarta Government Acts Swiftly to Tackle Flooding

    access_time30-01-2026 remove_red_eye345 personDessy Suciati
close