You don't have javascript enabled. Good luck with that.
Pencarian
Dinas Tata Air Bangun Sumur Resapan di SMAN 8

Absorption Well Provided at SMAN 8

Besides providing temporary water bin as deep as two meters, Jakarta Dept. of Water Management will also provide absorption well and biopore holes at SMAN 8, Bukit Duri, Tebet, South Jakarta.

The school is not completed with absorption well and biopore holes

“The school is not completed with absorption well and biopore holes. We’re working on it now,” said Teguh Hendarwan, Jakarta Head Dept. of Water Management, Monday (4/4).

According to him, the project could take less than a week.

SMAN 8 Prepares Flood Scenario

“We also placing sand sacks in front of school building to hold water from Ciliwung river,” he added.

Linked News
Popular News indeks
  1. Jakarta Taps MSMEs and Creative Economy to Secure Global Top 50 Spot

    access_time11-07-2026 remove_red_eye1575 personAldi Geri Lumban Tobing
  2. Ciliwung River Normalization Accelerated, Pramono Ensures Land Acquisition Without Intermediaries

    access_time10-07-2026 remove_red_eye1434 personDessy Suciati
  3. Blocked Drain on Jalan Palmerah Utara is Being Repaired

    access_time10-07-2026 remove_red_eye1299 personFolmer
  4. Jalan Kebon Kelapa I Repaved

    access_time07-07-2026 remove_red_eye1093 personNurito
  5. Pramono Inaugurates Mayapada Hospital to Improve Healthcare Services

    access_time09-07-2026 remove_red_eye965 personDessy Suciati