You don't have javascript enabled. Good luck with that.
Pencarian
Dinas Tata Air Bangun Sumur Resapan di SMAN 8

Absorption Well Provided at SMAN 8

Besides providing temporary water bin as deep as two meters, Jakarta Dept. of Water Management will also provide absorption well and biopore holes at SMAN 8, Bukit Duri, Tebet, South Jakarta.

The school is not completed with absorption well and biopore holes

“The school is not completed with absorption well and biopore holes. We’re working on it now,” said Teguh Hendarwan, Jakarta Head Dept. of Water Management, Monday (4/4).

According to him, the project could take less than a week.

SMAN 8 Prepares Flood Scenario

“We also placing sand sacks in front of school building to hold water from Ciliwung river,” he added.

Linked News
Popular News indeks
  1. Rano Reaffirms Jakarta's Vision of Becoming a City of Cinema

    access_time22-10-2026 remove_red_eye5468 personBudhi Firmansyah Surapati
  2. Jakarta Provincial Government Receives a Grant of Rp 9.6 Billion in KPK`s Seized Assets

    access_time20-10-2026 remove_red_eye4604 personDessy Suciati
  3. Drainage Channels Along Two Rawajati Roads Dredged

    access_time21-10-2026 remove_red_eye1810 personTiyo Surya Sakti
  4. Jakarta Pushed for Education Equity to Retain Top Student City Rank

    access_time19-10-2026 remove_red_eye1014 personFakhrizal Fakhri
  5. Jakarta Esports 2026: Celebrating Local Games, Music and More

    access_time19-10-2026 remove_red_eye1002 personAldi Geri Lumban Tobing