You don't have javascript enabled. Good luck with that.
Pencarian
Pengerjaaan Jalan Eks Kalijodo Sudah Mencapai 70 Persen
.
photo TP Moan Simanjuntak - Beritajakarta.id

Former Kalijodo Road Project Reaches 70 Percent

The arrangement of former Kalijodo area, Pejagalan Urban Village, Penjaringan Sub-district, North Jakarta keeps continued. One of the results is road widening by applying concrete layer from Pejagalan, North Jakarta to West Jakarta area.

Now the project is applying concrete layer. It remains 30 percent

Sudirman (45), one of workers, said the road widening has reached 70 percent.

“Now the project is applying concrete layer. It remains 30 percent,” he said, Monday (5/2).

Marunda Flat Residents Get Population Service

The heavy equipment operator, he added, leveling the land around the area.

“We do not know about facility construction,” he added.

The road can be passed for motorcycle from North to West Jakarta or vice versa.

Linked News
Popular News indeks
  1. Deputy Gov Rano: Meat Stocks Secured Up to Ramadhan

    access_time22-02-2025 remove_red_eye557 personBudhi Firmansyah Surapati
  2. Jakarta to Hold Cheap Food Bazaar at 193 Locations

    access_time22-02-2025 remove_red_eye451 personBudhi Firmansyah Surapati
  3. Pramono - Rano Expected to Realize Better Resident Welfare

    access_time20-02-2025 remove_red_eye309 personBudhi Firmansyah Surapati
  4. Jakartans Invited to Participate in HPSN 2025 Event

    access_time21-02-2025 remove_red_eye301 personAldi Geri Lumban Tobing
  5. 41 Wild Cats in Cikoko Sterilized

    access_time21-02-2025 remove_red_eye296 personTiyo Surya Sakti