You don't have javascript enabled. Good luck with that.
Pencarian
200 Titik Lampu PJU Akan Dipasang di Jalan Inspeksi Kali Apuran
.
photo Ilustrasi - Beritajakarta.id

Street Lights to Brighten Apuran River Inspection Road

West Jakarta Sub-dept. of Industry and Energy will instal 200 spots of street light on Apuran River Inspection road, Cengkareng.

We have proposed the budget since there is no light at all on the road

“We have proposed the budget since there is no light at all on the road,” said Saukani Anton, head of agency, Saturday (5/28).

According to him, smart LED system will be installed along six kilometer of the road.

Street Lights in W. Jakarta to Be Replaced with LED

His side proposes the installation of dozens of street light to city budget amendment.

“As temporary stage, those dozens of light will be installed first,” he added.

The inspection road construction about three kilometer is still running.

Linked News
Popular News indeks
  1. Jakarta-France Strengthen Cooperation in Various Sectors

    access_time11-04-2025 remove_red_eye387 personDessy Suciati
  2. 24-Hour Park Activation, City Government Finalizes the Plan

    access_time06-04-2025 remove_red_eye299 personBudhi Firmansyah Surapati
  3. Pramono - Rano Prays for Gontor Students to Succeed in Pursuing Knowledge

    access_time08-04-2025 remove_red_eye296 personDessy Suciati
  4. 17,000 Local Tourists Flock to Ragunan Zoo Today

    access_time07-04-2025 remove_red_eye278 personTiyo Surya Sakti
  5. Returning Flow at Kampung Rambutan Bus Terminal Conducive

    access_time07-04-2025 remove_red_eye271 personNurito

Hitung Mundur 22 Juni 2027

00
Hari
00
Jam
00
Menit
00
Detik