You don't have javascript enabled. Good luck with that.
Pencarian
200 Titik Lampu PJU Akan Dipasang di Jalan Inspeksi Kali Apuran

Street Lights to Brighten Apuran River Inspection Road

West Jakarta Sub-dept. of Industry and Energy will instal 200 spots of street light on Apuran River Inspection road, Cengkareng.

We have proposed the budget since there is no light at all on the road

“We have proposed the budget since there is no light at all on the road,” said Saukani Anton, head of agency, Saturday (5/28).

According to him, smart LED system will be installed along six kilometer of the road.

Street Lights in W. Jakarta to Be Replaced with LED

His side proposes the installation of dozens of street light to city budget amendment.

“As temporary stage, those dozens of light will be installed first,” he added.

The inspection road construction about three kilometer is still running.

Linked News
Popular News indeks
  1. Pramono Affirms Commitment to Enhancing Regional Financial Management Quality

    access_time02-04-2026 remove_red_eye793 personTiyo Surya Sakti
  2. Pramono Calls for Enhanced Synergy at DPRD Post-Eid Gathering

    access_time30-03-2026 remove_red_eye703 personDessy Suciati
  3. Banners Prohibiting Illegal Parking Levies Installed at Blok M Square

    access_time02-04-2026 remove_red_eye639 personTiyo Surya Sakti
  4. Kampung Rambutan Terminal Sees Increase in Intercity Bus Passengers

    access_time03-04-2026 remove_red_eye581 personNurito
  5. Gov Pramono: Jakarta Prepared to Adopt Weekly WFH Scheme

    access_time30-03-2026 remove_red_eye448 personDessy Suciati