You don't have javascript enabled. Good luck with that.
Pencarian
Hujan Deras, Terminal Pulogebang Tergenang

Pulogebang Terminal Inundates Up to 5-7 cm

A parking lot on the second floor of the Pulogebang Bus Terminal that located in Cakung, East Jakarta are inundated after heavy rain showered Jakarta yesterday. The water level reached 5-7 centimeters and has disturbed passengers who get off the bus.

This is very inconvenient us if the bus stops from the kanstine. We could step on a puddle

Reaying on Beritajakarta.com's observation, water inundates the north and south sides of the Block C building or bus arrival site. It continues to spread up to 50 meters. In building B or bus departure site, a number of janitors seen busy to clean and dry the floor from the water.

Stefanus (40), a visitor admitted that he was surprised when he knew rain inundated the terminal which is a grandest terminal in Indonesia.

IT Installation at Pulogebang Terminal Needs 3 Months

"This is very inconvenient us if the bus stops from the kanstine. We could step on a puddle," he exclaimed, Monday (6/6) 

Meanwhile, Head of Pulogebang Terminal Technical Management Unit, Nurhayati Sinaga, cannot be confirmed, either through a cell phone or a short message.

Linked News
Popular News indeks
  1. Cilandak Drainage Upgraded to Mitigate Flooding

    access_time27-01-2026 remove_red_eye869 personTiyo Surya Sakti
  2. TransJabodetabek Expansion, a Strategic Step to Increase Public Transportation Use

    access_time26-01-2026 remove_red_eye428 personFakhrizal Fakhri
  3. South Jakarta Tackles 38 Dengue Cases to Prevent Outbreak

    access_time02-02-2026 remove_red_eye417 personTiyo Surya Sakti
  4. Jakarta Prepares OMC and 200 Excavators to Prevent Flood

    access_time26-01-2026 remove_red_eye371 personDessy Suciati
  5. Jakarta Showers to Make Way for Partly Cloudy Skies

    access_time30-01-2026 remove_red_eye359 personDessy Suciati
close