Pulogebang Terminal Inundates Up to 5-7 cm
access_time June 07 2016 12:20 PM remove_red_eye 1970
Reported by Nurito | Translated by Nugroho Adibrata
Reported by Nurito | Translated by Nugroho Adibrata
A parking lot on the second floor of the Pulogebang Bus Terminal that located in Cakung, East Jakarta are inundated after heavy rain showered Jakarta yesterday. The water level reached 5-7 centimeters and has disturbed passengers who get off the bus.
This is very inconvenient us if the bus stops from the kanstine. We could step on a puddle
Reaying on Beritajakarta.com's observation, water inundates the north and south sides of the Block C building or bus arrival site. It continues to spread up to 50 meters. In building B or bus departure site, a number of janitors seen busy to clean and dry the floor from the water.
Stefanus (40), a visitor admitted that he was surprised when he knew rain inundated the terminal which is a grandest terminal in Indonesia.
IT Installation at Pulogebang Terminal Needs 3 Months"This is very inconvenient us if the bus stops from the kanstine. We could step on a puddle," he exclaimed, Monday (6/6)
Meanwhile, Head of Pulogebang Terminal Technical Management Unit, Nurhayati Sinaga, cannot be confirmed, either through a cell phone or a short message.