You don't have javascript enabled. Good luck with that.
Pencarian
Sterilisasi Busway, Koridor I Masih Aman
.
photo Aldi Geri Lumban Tobing - Beritajakarta.id

Busway Sterilization, Corridor I Runs Normally

As many as eight South Jakarta Sub-dept. of Transportation were deployed along Transjakarta corridor I (Blok M - Kota) lane. It is related with busway sterilization.

Corridor I is still safe

Personnel were seen at Plaza Bapindo, MT Haryono, Polda Metro Jaya, and Ratu Plaza.

Laura Leonika Harianja, Head Section of Monitoring and Handling for the agency, said the personnel are deployed since 7 AM to 2 PM.

Busway Sterilization Should Involve Residents

Based on Beritajakarta.com’s observation, there were no vehicles passing the lane. Moreover, no passenger surge at Transjakarta shelters.

“Corridor I is still safe,” she said.

Her side also deployed 20 personnel to Transjakarta pool on Jalan Hek Kramat Jati, East Jakarta. Those personnel will be spread into other corridors together with personnel from other administration agency.

Linked News
Popular News indeks
  1. Five Transjabodetabek Routes will Be Added to Tackle Traffic Congestion

    access_time09-05-2025 remove_red_eye668 personDessy Suciati
  2. Tanah Abang SDA Taskforce Normalizes Channels in Two Locations

    access_time12-05-2025 remove_red_eye457 personFolmer
  3. Munjirin Optimizes Physical and Non-Physical Development in East Jakarta

    access_time08-05-2025 remove_red_eye377 personNurito
  4. Community Work Held to Clean Environment in Petamburan

    access_time11-05-2025 remove_red_eye354 personFolmer
  5. Baduy Tribe Meets Pramono-Rano, Leaves Message of Protecting Nature

    access_time09-05-2025 remove_red_eye293 personDessy Suciati

Hitung Mundur 22 Juni 2027

00
Hari
00
Jam
00
Menit
00
Detik