You don't have javascript enabled. Good luck with that.
Pencarian
Tahap Awal LRT, Ruas Velodrome - Kelapagading

5 Stations will Be on Velodrome-Kelapa Gading LRT Lane

PT Jakarta Propertindo Director, Satya Heragandhi, said LRT construction first stage is constructed on Velodrome Rawamangun heading to Kelapa Gading.

The first stage construction is important for Asian Games athlete to avoid traffic jam

The lane length is 5.8 kilometer and completed with five stations. It is targeted to complete in June 2018.

“LRT construction is for supporting Asian Games 2018. Jakarta is one of the hosts,” he said, Wednesday (6/22).

Project of LRT, Velodrome and Equestrian Begins

The five stations are Velodrome Station, Pacuan Kuda, Pulomas, Kelapa Gading Boulevard and Kelapa Gading Mal. Budget prepared is Rp 4.5 trillion.

Jakarta Governor, Basuki T. Purnama hopes LRT construction at nine corridors will be able to parse traffic jam.

“The first stage construction is important for Asian Games athlete to avoid traffic jam,” Basuki stated.

Linked News
Popular News indeks
  1. Cilandak Drainage Upgraded to Mitigate Flooding

    access_time27-01-2026 remove_red_eye869 personTiyo Surya Sakti
  2. TransJabodetabek Expansion, a Strategic Step to Increase Public Transportation Use

    access_time26-01-2026 remove_red_eye427 personFakhrizal Fakhri
  3. Jakarta Prepares OMC and 200 Excavators to Prevent Flood

    access_time26-01-2026 remove_red_eye371 personDessy Suciati
  4. Jakarta Showers to Make Way for Partly Cloudy Skies

    access_time30-01-2026 remove_red_eye359 personDessy Suciati
  5. Several Microtrans Routes Diverted

    access_time31-01-2026 remove_red_eye358 personAldi Geri Lumban Tobing
close