You don't have javascript enabled. Good luck with that.
Pencarian
Penurapan Kali Cipinang Terkendala Permukiman Warga
.
photo Humas Jakarta Timur - Beritajakarta.id

Cipinang River Plastering Disturbed by Settlement

East Jakarta Mayor, Bambang Musyawardana said flood occurs at Jalan Raya Ciracas is caused by the overflow of Cipinang River.

River position is higher compared to the road

He requests Jakarta Dept. of Water Management to accelerate the plastering project for Cipinang river.

“River position is higher compared to the road,” he said, Monday (7/18).

Pasadena Connecting Channel Plastered

His side also hopes Kampung Rambutan reservoir project could be accelerated. It is aimed to flow the river water into the reservoir to reduce the flood impact.

Responding this matter, Jakarta Head Dept. of Water Management, Teguh Hendrawan stated the plastering is difficult to be run. There are too many permanent houses near the site.

“Central government is ready to assist, but we can not deploy the heavy equipments because of the buildings,” he stated.

Kampung Rambutan reservoir, he continued, has been run since two months ago. The project is accelerated in stages based on land buying process.

Linked News
Popular News indeks
  1. Commission E Urges Residents to Increase Role in Preventing DHF

    access_time19-12-2024 remove_red_eye1210 personDessy Suciati
  2. Transjakarta Adjusting Service as Simpang Pramuka and Rawamangun Bus Stops Closed

    access_time18-12-2024 remove_red_eye1053 personAldi Geri Lumban Tobing
  3. Transjakarta, Telkomsel to Improve Service for Customers

    access_time19-12-2024 remove_red_eye907 personAldi Geri Lumban Tobing
  4. Acting Governor Monitors Food Stock at Kramat Jati and Cipinang Markets

    access_time19-12-2024 remove_red_eye735 personFolmer
  5. Jakarta Provincial Government Holds Christmas Carol

    access_time18-12-2024 remove_red_eye578 personDessy Suciati