You don't have javascript enabled. Good luck with that.
Pencarian
Penurapan Kali Cipinang Terkendala Permukiman Warga
.
photo Humas Jakarta Timur - Beritajakarta.id

Cipinang River Plastering Disturbed by Settlement

East Jakarta Mayor, Bambang Musyawardana said flood occurs at Jalan Raya Ciracas is caused by the overflow of Cipinang River.

River position is higher compared to the road

He requests Jakarta Dept. of Water Management to accelerate the plastering project for Cipinang river.

“River position is higher compared to the road,” he said, Monday (7/18).

Pasadena Connecting Channel Plastered

His side also hopes Kampung Rambutan reservoir project could be accelerated. It is aimed to flow the river water into the reservoir to reduce the flood impact.

Responding this matter, Jakarta Head Dept. of Water Management, Teguh Hendrawan stated the plastering is difficult to be run. There are too many permanent houses near the site.

“Central government is ready to assist, but we can not deploy the heavy equipments because of the buildings,” he stated.

Kampung Rambutan reservoir, he continued, has been run since two months ago. The project is accelerated in stages based on land buying process.

Linked News
Popular News indeks
  1. Deputy Gov Rano: Meat Stocks Secured Up to Ramadhan

    access_time22-02-2025 remove_red_eye559 personBudhi Firmansyah Surapati
  2. Jakarta to Hold Cheap Food Bazaar at 193 Locations

    access_time22-02-2025 remove_red_eye454 personBudhi Firmansyah Surapati
  3. Pramono - Rano Expected to Realize Better Resident Welfare

    access_time20-02-2025 remove_red_eye310 personBudhi Firmansyah Surapati
  4. Jakartans Invited to Participate in HPSN 2025 Event

    access_time21-02-2025 remove_red_eye302 personAldi Geri Lumban Tobing
  5. 41 Wild Cats in Cikoko Sterilized

    access_time21-02-2025 remove_red_eye296 personTiyo Surya Sakti