You don't have javascript enabled. Good luck with that.
Pencarian
Penurapan Kali Cipinang Terkendala Permukiman Warga
.
photo Humas Jakarta Timur - Beritajakarta.id

Cipinang River Plastering Disturbed by Settlement

East Jakarta Mayor, Bambang Musyawardana said flood occurs at Jalan Raya Ciracas is caused by the overflow of Cipinang River.

River position is higher compared to the road

He requests Jakarta Dept. of Water Management to accelerate the plastering project for Cipinang river.

“River position is higher compared to the road,” he said, Monday (7/18).

Pasadena Connecting Channel Plastered

His side also hopes Kampung Rambutan reservoir project could be accelerated. It is aimed to flow the river water into the reservoir to reduce the flood impact.

Responding this matter, Jakarta Head Dept. of Water Management, Teguh Hendrawan stated the plastering is difficult to be run. There are too many permanent houses near the site.

“Central government is ready to assist, but we can not deploy the heavy equipments because of the buildings,” he stated.

Kampung Rambutan reservoir, he continued, has been run since two months ago. The project is accelerated in stages based on land buying process.

Linked News
Popular News indeks
  1. Jakarta to Go Dark for One Hour on April 26, 2025

    access_time24-04-2025 remove_red_eye487 personAldi Geri Lumban Tobing
  2. Governor Pramono Joins Cycling in Jakarta Silaturahride 2025

    access_time19-04-2025 remove_red_eye416 personBudhi Firmansyah Surapati
  3. Transjakarta Applies Special Fares for Female Customers

    access_time20-04-2025 remove_red_eye292 personAldi Geri Lumban Tobing
  4. City Goverment Encourages Residents to Use Public Transportation

    access_time21-04-2025 remove_red_eye287 personFakhrizal Fakhri
  5. Residents Advised to Apply for PPSU and Damkar Positions at Urban Village Offices

    access_time23-04-2025 remove_red_eye269 personFakhrizal Fakhri

Hitung Mundur 22 Juni 2027

00
Hari
00
Jam
00
Menit
00
Detik