You don't have javascript enabled. Good luck with that.
Pencarian
Penurapan Kali Cipinang Terkendala Permukiman Warga

Cipinang River Plastering Disturbed by Settlement

East Jakarta Mayor, Bambang Musyawardana said flood occurs at Jalan Raya Ciracas is caused by the overflow of Cipinang River.

River position is higher compared to the road

He requests Jakarta Dept. of Water Management to accelerate the plastering project for Cipinang river.

“River position is higher compared to the road,” he said, Monday (7/18).

Pasadena Connecting Channel Plastered

His side also hopes Kampung Rambutan reservoir project could be accelerated. It is aimed to flow the river water into the reservoir to reduce the flood impact.

Responding this matter, Jakarta Head Dept. of Water Management, Teguh Hendrawan stated the plastering is difficult to be run. There are too many permanent houses near the site.

“Central government is ready to assist, but we can not deploy the heavy equipments because of the buildings,” he stated.

Kampung Rambutan reservoir, he continued, has been run since two months ago. The project is accelerated in stages based on land buying process.

Linked News
Popular News indeks
  1. Suckermouth Catfish Control for Environmental Preservation

    access_time18-04-2026 remove_red_eye789 personFakhrizal Fakhri
  2. Jakarta to Hold Citywide Lights-Out Initiative

    access_time24-04-2026 remove_red_eye637 personAldi Geri Lumban Tobing
  3. Suckerfish Handling in South Jakarta is Run in Accordance with MUI Recommendations

    access_time21-04-2026 remove_red_eye629 personTiyo Surya Sakti
  4. Jakarta Newcomers Mostly in Productive Age

    access_time22-04-2026 remove_red_eye386 personAldi Geri Lumban Tobing
  5. Rano Leads Parking Arrangement on Jalan R.A. Kartini, Lebak Bulus

    access_time24-04-2026 remove_red_eye371 personBudhi Firmansyah Surapati