You don't have javascript enabled. Good luck with that.
Pencarian
Pembebasan Lahan Depo MRT Dipastikan Tidak Terkendala

MRT Depot Land Buying Process Has No Problem

Jakarta Provincial Government ensures the construction of Mass Rapid Transit (MRT) depot will not be disturbed by land buying process. The budget will be proposed again in budget amendment this year.

We try to speed the budget disbursement by this year

Jakarta Head Dept. of Transportation, Andri Yansyah, said the fund was proposed in 2016 budget. Because of technical factor, the budget was also removed. Now his side will propose it again in budget amendment.

“We try to speed the budget disbursement by this year,” he said, Friday (7/22).

Residents Agree to Give Their Land for MRT

He is optimistic that the land to be used as MRT depot can be bought fully this year. At this moment, total land for this project is 105 hectare, and already bought by 92 percent.

“It remains 25 lots, or two percent put of total land we need,” he added.

Linked News
Popular News indeks
  1. Suckermouth Catfish Control for Environmental Preservation

    access_time18-04-2026 remove_red_eye791 personFakhrizal Fakhri
  2. Jakarta to Hold Citywide Lights-Out Initiative

    access_time24-04-2026 remove_red_eye646 personAldi Geri Lumban Tobing
  3. Suckerfish Handling in South Jakarta is Run in Accordance with MUI Recommendations

    access_time21-04-2026 remove_red_eye631 personTiyo Surya Sakti
  4. Jakarta Newcomers Mostly in Productive Age

    access_time22-04-2026 remove_red_eye387 personAldi Geri Lumban Tobing
  5. Rano Leads Parking Arrangement on Jalan R.A. Kartini, Lebak Bulus

    access_time24-04-2026 remove_red_eye385 personBudhi Firmansyah Surapati