You don't have javascript enabled. Good luck with that.
Pencarian
Pembebasan Lahan Depo MRT Dipastikan Tidak Terkendala

MRT Depot Land Buying Process Has No Problem

Jakarta Provincial Government ensures the construction of Mass Rapid Transit (MRT) depot will not be disturbed by land buying process. The budget will be proposed again in budget amendment this year.

We try to speed the budget disbursement by this year

Jakarta Head Dept. of Transportation, Andri Yansyah, said the fund was proposed in 2016 budget. Because of technical factor, the budget was also removed. Now his side will propose it again in budget amendment.

“We try to speed the budget disbursement by this year,” he said, Friday (7/22).

Residents Agree to Give Their Land for MRT

He is optimistic that the land to be used as MRT depot can be bought fully this year. At this moment, total land for this project is 105 hectare, and already bought by 92 percent.

“It remains 25 lots, or two percent put of total land we need,” he added.

Linked News
Popular News indeks
  1. Jakarta Taps MSMEs and Creative Economy to Secure Global Top 50 Spot

    access_time11-07-2026 remove_red_eye1633 personAldi Geri Lumban Tobing
  2. Ciliwung River Normalization Accelerated, Pramono Ensures Land Acquisition Without Intermediaries

    access_time10-07-2026 remove_red_eye1459 personDessy Suciati
  3. Blocked Drain on Jalan Palmerah Utara is Being Repaired

    access_time10-07-2026 remove_red_eye1324 personFolmer
  4. Pramono will Take Firm Action Against Individuals Involved in Extortion

    access_time13-07-2026 remove_red_eye1098 personDessy Suciati
  5. Pramono Inaugurates Mayapada Hospital to Improve Healthcare Services

    access_time09-07-2026 remove_red_eye983 personDessy Suciati