You don't have javascript enabled. Good luck with that.
Pencarian
Pembebasan Lahan Depo MRT Dipastikan Tidak Terkendala

MRT Depot Land Buying Process Has No Problem

Jakarta Provincial Government ensures the construction of Mass Rapid Transit (MRT) depot will not be disturbed by land buying process. The budget will be proposed again in budget amendment this year.

We try to speed the budget disbursement by this year

Jakarta Head Dept. of Transportation, Andri Yansyah, said the fund was proposed in 2016 budget. Because of technical factor, the budget was also removed. Now his side will propose it again in budget amendment.

“We try to speed the budget disbursement by this year,” he said, Friday (7/22).

Residents Agree to Give Their Land for MRT

He is optimistic that the land to be used as MRT depot can be bought fully this year. At this moment, total land for this project is 105 hectare, and already bought by 92 percent.

“It remains 25 lots, or two percent put of total land we need,” he added.

Linked News
Popular News indeks
  1. Cilandak Drainage Upgraded to Mitigate Flooding

    access_time27-01-2026 remove_red_eye869 personTiyo Surya Sakti
  2. TransJabodetabek Expansion, a Strategic Step to Increase Public Transportation Use

    access_time26-01-2026 remove_red_eye428 personFakhrizal Fakhri
  3. Jakarta Prepares OMC and 200 Excavators to Prevent Flood

    access_time26-01-2026 remove_red_eye371 personDessy Suciati
  4. South Jakarta Tackles 38 Dengue Cases to Prevent Outbreak

    access_time02-02-2026 remove_red_eye362 personTiyo Surya Sakti
  5. Jakarta Showers to Make Way for Partly Cloudy Skies

    access_time30-01-2026 remove_red_eye359 personDessy Suciati
close