You don't have javascript enabled. Good luck with that.
Pencarian
Pembebasan Lahan Depo MRT Dipastikan Tidak Terkendala

MRT Depot Land Buying Process Has No Problem

Jakarta Provincial Government ensures the construction of Mass Rapid Transit (MRT) depot will not be disturbed by land buying process. The budget will be proposed again in budget amendment this year.

We try to speed the budget disbursement by this year

Jakarta Head Dept. of Transportation, Andri Yansyah, said the fund was proposed in 2016 budget. Because of technical factor, the budget was also removed. Now his side will propose it again in budget amendment.

“We try to speed the budget disbursement by this year,” he said, Friday (7/22).

Residents Agree to Give Their Land for MRT

He is optimistic that the land to be used as MRT depot can be bought fully this year. At this moment, total land for this project is 105 hectare, and already bought by 92 percent.

“It remains 25 lots, or two percent put of total land we need,” he added.

Linked News
Popular News indeks
  1. Open for All: Jakarta City Hall Welcomes Visitors for Namu Balai Kota

    access_time03-10-2026 remove_red_eye557 personDessy Suciati
  2. Jakarta Builds Five New Animal Health Centers to Expand Veterinary Services

    access_time30-09-2026 remove_red_eye497 personAldi Geri Lumban Tobing
  3. Transjakarta Reaffirms Ban on Busking in Mikrotrans and Bus Stops

    access_time02-10-2026 remove_red_eye465 personAldi Geri Lumban Tobing
  4. Commission D Supports Reserve Fund for Long-Term Infrastructure

    access_time02-10-2026 remove_red_eye434 personFakhrizal Fakhri
  5. Buildings on the Sidewalk in Front of Plumpang Transjakarta Bus Stop Demolished

    access_time30-09-2026 remove_red_eye412 personAnita Karyati