You don't have javascript enabled. Good luck with that.
Pencarian
Pembebasan Lahan Depo MRT Dipastikan Tidak Terkendala
.
photo istimewa - Beritajakarta.id

MRT Depot Land Buying Process Has No Problem

Jakarta Provincial Government ensures the construction of Mass Rapid Transit (MRT) depot will not be disturbed by land buying process. The budget will be proposed again in budget amendment this year.

We try to speed the budget disbursement by this year

Jakarta Head Dept. of Transportation, Andri Yansyah, said the fund was proposed in 2016 budget. Because of technical factor, the budget was also removed. Now his side will propose it again in budget amendment.

“We try to speed the budget disbursement by this year,” he said, Friday (7/22).

Residents Agree to Give Their Land for MRT

He is optimistic that the land to be used as MRT depot can be bought fully this year. At this moment, total land for this project is 105 hectare, and already bought by 92 percent.

“It remains 25 lots, or two percent put of total land we need,” he added.

Linked News
Popular News indeks
  1. Duren Sawit PTSP Holds Door-to-Door Servies at Pondok Kelapa TPU until Thursday

    access_time15-05-2024 remove_red_eye539 personNurito
  2. Commission D: RDF Construction in Rorotan Has Many Benefits

    access_time13-05-2024 remove_red_eye474 personFolmer
  3. Tengah Urban Village PPSU Personnel Clean Fire Debris

    access_time10-05-2024 remove_red_eye465 personNurito
  4. Jalan YRS III Repairs in South Jakarta Completed

    access_time10-05-2024 remove_red_eye445 personTiyo Surya Sakti
  5. 35 Toddlers in Kedoya Selatan Received Assistance with Nutritious Additional Food

    access_time13-05-2024 remove_red_eye435 personTP Moan Simanjuntak