You don't have javascript enabled. Good luck with that.
Pencarian
BPPBJ DKI Didesak Percepat Proses Lelang

Jakarta BPPBJ Demanded to Speed Up Auction Process

Jakarta Housing and Government Building Dept is complaining the slow process of determining the auction winner in Jakarta Goods and Service Procurement Agency (BPPBJ).

BPPBJ must set the auction winner soon

Head of Jakarta Housing and Government Building Dept, Arifin disclosed, the slow of determining the auction winner in Jakarta BPPBJ has hampered physical work in his rank. 

"BPPBJ must set the auction winner soon," he stated, Thursday (7/28).

BPPBJ Led by One of the Best indonesian Assessors

He disclosed, this year, the Housing Dept gets budget around Rp 4 trillion. It is mostly used for physical construction such as the flat.

"Flat construction is almost 30 projects, building maintenance 20 projects and local government building with 13 projects. All projects are still under auction process," he expressed.

According to him, acceleration in auction process in BPPBJ is very needed. Considering budget absorption in his rank is reaching 3.47 percent.

"I'm optimistic budget absorption can increase. 2016 budget must wait for five months ahead," he finished.

Linked News
Popular News indeks
  1. 129 Motorcycle Parked Illegally in Daan Mogot Controlled

    access_time08-11-2026 remove_red_eye691 personBudhi Firmansyah Surapati
  2. Jakarta to Develop Its First Mangrove Botanical Garden

    access_time06-11-2026 remove_red_eye646 personDessy Suciati
  3. Kampung Melayu Sports Facility Inaugurated to Tackle Brawls

    access_time06-11-2026 remove_red_eye644 personDessy Suciati
  4. Aid for Fire Survivors at Pinus Elok Flats Has Been Distributed

    access_time06-11-2026 remove_red_eye618 personNurito
  5. Kampung Rambutan 1 Reservoir to Combine Flood Control with Public Recreation

    access_time06-11-2026 remove_red_eye610 personAldi Geri Lumban Tobing