You don't have javascript enabled. Good luck with that.
Pencarian
BPPBJ DKI Didesak Percepat Proses Lelang

Jakarta BPPBJ Demanded to Speed Up Auction Process

Jakarta Housing and Government Building Dept is complaining the slow process of determining the auction winner in Jakarta Goods and Service Procurement Agency (BPPBJ).

BPPBJ must set the auction winner soon

Head of Jakarta Housing and Government Building Dept, Arifin disclosed, the slow of determining the auction winner in Jakarta BPPBJ has hampered physical work in his rank. 

"BPPBJ must set the auction winner soon," he stated, Thursday (7/28).

BPPBJ Led by One of the Best indonesian Assessors

He disclosed, this year, the Housing Dept gets budget around Rp 4 trillion. It is mostly used for physical construction such as the flat.

"Flat construction is almost 30 projects, building maintenance 20 projects and local government building with 13 projects. All projects are still under auction process," he expressed.

According to him, acceleration in auction process in BPPBJ is very needed. Considering budget absorption in his rank is reaching 3.47 percent.

"I'm optimistic budget absorption can increase. 2016 budget must wait for five months ahead," he finished.

Linked News
Popular News indeks
  1. Cilandak Drainage Upgraded to Mitigate Flooding

    access_time27-01-2026 remove_red_eye869 personTiyo Surya Sakti
  2. TransJabodetabek Expansion, a Strategic Step to Increase Public Transportation Use

    access_time26-01-2026 remove_red_eye424 personFakhrizal Fakhri
  3. Jakarta Prepares OMC and 200 Excavators to Prevent Flood

    access_time26-01-2026 remove_red_eye371 personDessy Suciati
  4. Jakarta Showers to Make Way for Partly Cloudy Skies

    access_time30-01-2026 remove_red_eye359 personDessy Suciati
  5. Several Microtrans Routes Diverted

    access_time31-01-2026 remove_red_eye358 personAldi Geri Lumban Tobing
close