You don't have javascript enabled. Good luck with that.
Pencarian
BPPBJ DKI Didesak Percepat Proses Lelang

Jakarta BPPBJ Demanded to Speed Up Auction Process

Jakarta Housing and Government Building Dept is complaining the slow process of determining the auction winner in Jakarta Goods and Service Procurement Agency (BPPBJ).

BPPBJ must set the auction winner soon

Head of Jakarta Housing and Government Building Dept, Arifin disclosed, the slow of determining the auction winner in Jakarta BPPBJ has hampered physical work in his rank. 

"BPPBJ must set the auction winner soon," he stated, Thursday (7/28).

BPPBJ Led by One of the Best indonesian Assessors

He disclosed, this year, the Housing Dept gets budget around Rp 4 trillion. It is mostly used for physical construction such as the flat.

"Flat construction is almost 30 projects, building maintenance 20 projects and local government building with 13 projects. All projects are still under auction process," he expressed.

According to him, acceleration in auction process in BPPBJ is very needed. Considering budget absorption in his rank is reaching 3.47 percent.

"I'm optimistic budget absorption can increase. 2016 budget must wait for five months ahead," he finished.

Linked News
Popular News indeks
  1. Closure of Railway Level Crossings Socialized

    access_time13-05-2026 remove_red_eye2377 personTiyo Surya Sakti
  2. Telkomsel Digiland Run 2026 Parking Lot List: Check Now!

    access_time14-05-2026 remove_red_eye1007 personAldi Geri Lumban Tobing
  3. Governor Pram Appreciates Residents for Keeping Jakarta Safe and Comfortable

    access_time09-05-2026 remove_red_eye986 personFolmer
  4. Waste Sorting Movement Boosts Circular Economy

    access_time12-05-2026 remove_red_eye853 personFakhrizal Fakhri
  5. Fire Burns Five Houses in Cengkareng Extinguished

    access_time12-05-2026 remove_red_eye746 personBudhi Firmansyah Surapati