You don't have javascript enabled. Good luck with that.
Pencarian
Ribuan Karung Lumpur Kurasan PHB Murni dan KPAD Diangkut

Thousands of Mud Sack at Connecting Channel Transported

Thousands of mud sack resulted from channel dredging at Murni and KPAD connecting channel, Joglo, Kembangan, West Jakarta were transported.

The sacks were already there for long time. It’s time to transport it

Kembangan Sub-district Head, Agus Ramdani, said the sacks were transported based on citizens request on Qlue.

“The sacks were already there for long time. It’s time to transport it,” he said, Tuesday (8/16).

Mud at Pesanggrahan River Dredged

According to him, as many as 20 freelancers of West Jakarta Sub-dept. of Water Management were deployed and assisted by three trucks.

“The dredging projects remains running now,” he closed.

Linked News
Popular News indeks
  1. Cilandak Drainage Upgraded to Mitigate Flooding

    access_time27-01-2026 remove_red_eye869 personTiyo Surya Sakti
  2. TransJabodetabek Expansion, a Strategic Step to Increase Public Transportation Use

    access_time26-01-2026 remove_red_eye428 personFakhrizal Fakhri
  3. Jakarta Prepares OMC and 200 Excavators to Prevent Flood

    access_time26-01-2026 remove_red_eye371 personDessy Suciati
  4. Jakarta Showers to Make Way for Partly Cloudy Skies

    access_time30-01-2026 remove_red_eye359 personDessy Suciati
  5. Several Microtrans Routes Diverted

    access_time31-01-2026 remove_red_eye358 personAldi Geri Lumban Tobing
close