You don't have javascript enabled. Good luck with that.
Pencarian
Tiga Saluran PHB di Jakbar Akan Segera di Sheet Pile

Sheet Pile to Be Installed at 3 Connecting Channels

Three connecting channels in West Jakarta will be installed with sheet pile. The effort is aimed to minimize puddle at areas passed by the channel.

Sheet pile installation is aimed to minimize puddle

West Jakarta Head Sub-dept. of Water Management, Imron Syahrin said those three connecting channels are Taman Ratu, Bendungan Cisadane Timur and Kali Duri.

“Sheet pile installation is aimed to minimize puddle,” he said, Monday (8/21).

Lots of Channels in S. Jakarta Covered by Buildings

According to him, Taman Ratu has length 2.4 kilometer, Bendungan Cisadane 900 meter and Kali Duri 900 meter.

“It will start this week by preparing Rp 85 billion. It is targeted to complete on December 20,” he closed.

Linked News
Popular News indeks
  1. Jakarta Govt-City Council Step Up Coordination to Address Key Urban Challenges

    access_time22-02-2026 remove_red_eye1361 personFakhrizal Fakhri
  2. Transjakarta Brings Lunar New Year Festivities to Public Transport

    access_time16-02-2026 remove_red_eye1028 personAldi Geri Lumban Tobing
  3. Free Transit Card Applications Skyrocket 143%, Passing 76k Mark

    access_time20-02-2026 remove_red_eye957 personAldi Geri Lumban Tobing
  4. CNY 2577 Kongzili: Matakin Calls for Justice and Solidarity

    access_time22-02-2026 remove_red_eye765 personAldi Geri Lumban Tobing
  5. Public Works Agency Gets Transjakarta Corridor 13 Back in Tip-Top Shape

    access_time17-02-2026 remove_red_eye733 personAldi Geri Lumban Tobing