You don't have javascript enabled. Good luck with that.
Pencarian
Tiga Saluran PHB di Jakbar Akan Segera di Sheet Pile

Sheet Pile to Be Installed at 3 Connecting Channels

Three connecting channels in West Jakarta will be installed with sheet pile. The effort is aimed to minimize puddle at areas passed by the channel.

Sheet pile installation is aimed to minimize puddle

West Jakarta Head Sub-dept. of Water Management, Imron Syahrin said those three connecting channels are Taman Ratu, Bendungan Cisadane Timur and Kali Duri.

“Sheet pile installation is aimed to minimize puddle,” he said, Monday (8/21).

Lots of Channels in S. Jakarta Covered by Buildings

According to him, Taman Ratu has length 2.4 kilometer, Bendungan Cisadane 900 meter and Kali Duri 900 meter.

“It will start this week by preparing Rp 85 billion. It is targeted to complete on December 20,” he closed.

Linked News
Popular News indeks
  1. Pram-Rano Attend Bung Karno Festival at Proklamasi Park

    access_time20-06-2026 remove_red_eye1097 personFolmer
  2. JIS-Ancol Integrated Infrastructure Officially Activated

    access_time23-06-2026 remove_red_eye580 personDessy Suciati
  3. Jakarta Light Festival Dazzles Visitors at Kota Tua

    access_time22-06-2026 remove_red_eye505 personBudhi Firmansyah Surapati
  4. Free Cake-Making Training Held at RPTRA Mustika Ratu

    access_time23-06-2026 remove_red_eye505 personNurito
  5. Jakarta Steps Up to the Plate as PON 2028’s Support System

    access_time24-06-2026 remove_red_eye485 personFakhrizal Fakhri