You don't have javascript enabled. Good luck with that.
Pencarian
Tiga Saluran PHB di Jakbar Akan Segera di Sheet Pile

Sheet Pile to Be Installed at 3 Connecting Channels

Three connecting channels in West Jakarta will be installed with sheet pile. The effort is aimed to minimize puddle at areas passed by the channel.

Sheet pile installation is aimed to minimize puddle

West Jakarta Head Sub-dept. of Water Management, Imron Syahrin said those three connecting channels are Taman Ratu, Bendungan Cisadane Timur and Kali Duri.

“Sheet pile installation is aimed to minimize puddle,” he said, Monday (8/21).

Lots of Channels in S. Jakarta Covered by Buildings

According to him, Taman Ratu has length 2.4 kilometer, Bendungan Cisadane 900 meter and Kali Duri 900 meter.

“It will start this week by preparing Rp 85 billion. It is targeted to complete on December 20,” he closed.

Linked News
Popular News indeks
  1. Pramono Affirms Commitment to Enhancing Regional Financial Management Quality

    access_time02-04-2026 remove_red_eye803 personTiyo Surya Sakti
  2. Pramono Calls for Enhanced Synergy at DPRD Post-Eid Gathering

    access_time30-03-2026 remove_red_eye707 personDessy Suciati
  3. Kampung Rambutan Terminal Sees Increase in Intercity Bus Passengers

    access_time03-04-2026 remove_red_eye669 personNurito
  4. Banners Prohibiting Illegal Parking Levies Installed at Blok M Square

    access_time02-04-2026 remove_red_eye645 personTiyo Surya Sakti
  5. Gov Pramono: Jakarta Prepared to Adopt Weekly WFH Scheme

    access_time30-03-2026 remove_red_eye452 personDessy Suciati