You don't have javascript enabled. Good luck with that.
Pencarian
20 Petugas Damkar Bantu Bersihkan Lumpur Sisa Banjir

20 Fire Handling Personnel Clean Flood Mud

As many as 20 personnel of East Jakarta Sub-dept. of Fire Handling and Rescue were deployed to clean flood mud, Saturday (8/27). The effort was run after flood at Kalisari receded at 7 PM.

Those two houses are the worst condition

They cleaned the mud at two houses, Rukmana (52) at Jalan Kalisari Asri RT 12/03 No. B 11 Kalisari, and Col. Kosasih (57) at Jalan Kalisari Asri RT 12/03 No. A 29.

“Those two houses are the worst condition,” said Gatot.

Broken Wall Caused Flood in Kemang

His side deployed one floating-type pump to suck puddle. It has capacity 250 liter per minute.

As reported earlier, heavy rain caused flood at several locations in Kalisari Urban Village, Pasarebo. About 25 people were evacuated by using rubber boat. Now they have back to their houses.

Linked News
Popular News indeks
  1. Pram-Rano Attend Bung Karno Festival at Proklamasi Park

    access_time20-06-2026 remove_red_eye1090 personFolmer
  2. JIS-Ancol Integrated Infrastructure Officially Activated

    access_time23-06-2026 remove_red_eye575 personDessy Suciati
  3. Free Cake-Making Training Held at RPTRA Mustika Ratu

    access_time23-06-2026 remove_red_eye499 personNurito
  4. Metropolitan City Rally 2026 to Be Held at City Hall

    access_time19-06-2026 remove_red_eye477 personAldi Geri Lumban Tobing
  5. Rano Officially Opens Discover Betawi Art and Culture 2026

    access_time19-06-2026 remove_red_eye475 personBudhi Firmansyah Surapati