You don't have javascript enabled. Good luck with that.
Pencarian
Pembangunan Tanggul Pantura Jakarta untuk Kurangi Banjir

Pantura Dike Construction Aims Reducing Flood

Flood in the capital can not be handled well before completing the north beach dike construction. The existing dike height is only 2.8 meters, or still under tidal wave by three meters.

Why flood remains occur, because the dike is yet completed

“Why flood remains occur, because the dike is yet completed,” said Jakarta Governor, Basuki T. Purnama, Monday (8/22).

According to him, flood will remain hit Jakarta of the dike is not completed. If it is added with local rain during three days, then 40 percent of Jakarta areas will be flooded.

City Keeps Improving Infrastructure for Flood Handling

If there is no tidal wave, he added, flood in Jakarta will recede quickly. It is because all water channels are dredged and water pumps are also deployed.

“No tidal wave means flood in Jakarta will quickly recede,” he added.

Basuki admitted keeps buying heavy equipments to dredge the channel. It is predicted channel dredging can be completed in two years by keeping buying heavy equipments.

“Heavy equipments will assist us completing the channel dredging in two years,” he closed.

Linked News
Popular News indeks
  1. Suckermouth Catfish Control for Environmental Preservation

    access_time18-04-2026 remove_red_eye784 personFakhrizal Fakhri
  2. Suckerfish Handling in South Jakarta is Run in Accordance with MUI Recommendations

    access_time21-04-2026 remove_red_eye622 personTiyo Surya Sakti
  3. Jakarta to Hold Citywide Lights-Out Initiative

    access_time24-04-2026 remove_red_eye423 personAldi Geri Lumban Tobing
  4. Jakarta Newcomers Mostly in Productive Age

    access_time22-04-2026 remove_red_eye383 personAldi Geri Lumban Tobing
  5. East Jakarta Steps Up Services to Simplify Population Registration

    access_time20-04-2026 remove_red_eye355 personNurito