You don't have javascript enabled. Good luck with that.
Pencarian
Alat Berat Mulai Didatangkan Ke Kali Krukut
.
photo Jhon Syah Putra Kaban - Beritajakarta.id

Heavy Equipments Arrived at Krukut River

Jakarta Dept. of Water Management starts to normalize the Krukut River, Kemang, South Jakarta. Since last night one heavy equipment has been deployed.

One unit of amphibious excavator has arrived and directly dredged the river

“One unit of amphibious excavator has arrived and directly dredged the river,” said Teguh Hendarwan, head of agency, Tuesday (8/30).

According to him, there are 15 heavy equipments to be deployed at the location. Maximally, the dredging will be applied up to 1.5 meters.

Buildings on Krukut Riverbank will Be Demolished Soon

“Sediment at the location is quite high,” he added.

Previously, heavy flow of Krukut River caused the settlement wall collapsed. The agency installed bagworks as the temporary handling.

Linked News
Popular News indeks
  1. Jakarta-France Strengthen Cooperation in Various Sectors

    access_time11-04-2025 remove_red_eye517 personDessy Suciati
  2. Three South Jakarta Parks Set for Revitalization and 24-Hour Operation

    access_time12-04-2025 remove_red_eye431 personDessy Suciati
  3. 60 Joint Personnel Conduct Community Work in Karet Tengsin

    access_time13-04-2025 remove_red_eye368 personBudhi Firmansyah Surapati
  4. Jakarta to be Designed as a Film City

    access_time13-04-2025 remove_red_eye239 personFakhrizal Fakhri
  5. BTN Jakarta International Marathon 2025, Be There!

    access_time14-04-2025 remove_red_eye224 personDessy Suciati

Hitung Mundur 22 Juni 2027

00
Hari
00
Jam
00
Menit
00
Detik