You don't have javascript enabled. Good luck with that.
Pencarian
Alat Berat Mulai Didatangkan Ke Kali Krukut

Heavy Equipments Arrived at Krukut River

Jakarta Dept. of Water Management starts to normalize the Krukut River, Kemang, South Jakarta. Since last night one heavy equipment has been deployed.

One unit of amphibious excavator has arrived and directly dredged the river

“One unit of amphibious excavator has arrived and directly dredged the river,” said Teguh Hendarwan, head of agency, Tuesday (8/30).

According to him, there are 15 heavy equipments to be deployed at the location. Maximally, the dredging will be applied up to 1.5 meters.

Buildings on Krukut Riverbank will Be Demolished Soon

“Sediment at the location is quite high,” he added.

Previously, heavy flow of Krukut River caused the settlement wall collapsed. The agency installed bagworks as the temporary handling.

Linked News
Popular News indeks
  1. Jakarta Government Guarantees Full Medical Care for Bantargebang Landslide Victims

    access_time09-03-2026 remove_red_eye1296 personDessy Suciati
  2. Commission E Supports Restricting Children's Access to Social Media

    access_time09-03-2026 remove_red_eye1126 personFakhrizal Fakhri
  3. Affordable and High-Quality Staple Goods Offered at Ramadan Bazaar

    access_time09-03-2026 remove_red_eye838 personAldi Geri Lumban Tobing
  4. Jakarta Planetarium Rolls Out Varied Shows for Eid al-Fitr Holiday

    access_time11-03-2026 remove_red_eye289 personAldi Geri Lumban Tobing
  5. Jakarta Speeds Up Flood Mitigation Efforts

    access_time08-03-2026 remove_red_eye285 personAldi Geri Lumban Tobing