You don't have javascript enabled. Good luck with that.
Pencarian
Alat Berat Mulai Didatangkan Ke Kali Krukut

Heavy Equipments Arrived at Krukut River

Jakarta Dept. of Water Management starts to normalize the Krukut River, Kemang, South Jakarta. Since last night one heavy equipment has been deployed.

One unit of amphibious excavator has arrived and directly dredged the river

“One unit of amphibious excavator has arrived and directly dredged the river,” said Teguh Hendarwan, head of agency, Tuesday (8/30).

According to him, there are 15 heavy equipments to be deployed at the location. Maximally, the dredging will be applied up to 1.5 meters.

Buildings on Krukut Riverbank will Be Demolished Soon

“Sediment at the location is quite high,” he added.

Previously, heavy flow of Krukut River caused the settlement wall collapsed. The agency installed bagworks as the temporary handling.

Linked News
Popular News indeks
  1. City Council Strengthens Synergy with Central Legislators to Support Jakarta`s Development

    access_time30-07-2026 remove_red_eye1076 personFakhrizal Fakhri
  2. Jakarta Partners with Five Satellite Cities for Greater Jakarta Connected Initiative

    access_time30-07-2026 remove_red_eye602 personBudhi Firmansyah Surapati
  3. Pramono Praises Young Innovators at the Jakarta Robotic Games 2026

    access_time28-07-2026 remove_red_eye489 personDessy Suciati
  4. Jakarta Reaffirms Commitment to Preserving Cultural Heritage

    access_time31-07-2026 remove_red_eye487 personDessy Suciati
  5. Various Events Prepared for Jakarta`s 5th Century Anniversary

    access_time29-07-2026 remove_red_eye472 personFakhrizal Fakhri