Pinang Kali Jati Connectiong Channel Normalized
access_time September 10 2016 03:59 PM remove_red_eye 1605
Reported by Suparni | Translated by Nugroho Adibrata
Reported by Suparni | Translated by Nugroho Adibrata
The normalization of Pinang Kali Jati connecting channel that conducted at Jl Melati III, RT 09/02, Pondok Labu Urban Village, CIlandak, finally begins today, Saturday (9/10).
Today, we'll do water pumping and then dredge the river where it will be made as a water cistern
Normalization is to prevent landslide disaster that had occurred a few days ago. To send one excavator, South Jakarta Administration should tear down some homes as the access road.
Kelapa Puan Connecting Channel DredgedSouth Jakarta Water Management Sub-dept Head, Holi Susanto disclosed, if there are no obstacles, the heavy equipement can already be used to handle landslide in Pondok Labu.
"Today, we'll do water pumping and then dredge the river where it will be made as a water cistern. After that, we will dredge the channel," he expressed, Saturday (9/10).
Besides dredging, sheet pile reparation will also be done. "Certainly, we will do this carefully. If not, the sheet pile will easily collapse," he finished.