You don't have javascript enabled. Good luck with that.
Pencarian
 Padat Lumpur, Waduk Rawa Kepa Dinormalisasi

Rawa Kepa Reservoir Normalized

The Rawa Kepa Reservoir that located at Jl Rawa Kepa V, Tomang Urban Village, Grogol Petamburan Sub-district, normalized. It is targeted to be complete in the upcoming December.

Mud already seen dries and strewn by wild grass and trees. It makes the reservoir narrow and slum

West Jakarta Water Management Sub-dept Head, imron Syahrin disclosed, the reservoir has 4,000 square meters wide. His sub-dept sent two excavators to dredge mud in the reservoir.

Gendong Cakung Drain River Normalized

"Mud already seen dries and strewn by wild grass and trees. It makes the reservoir narrow and slum," he expressed, Saturday (9/10).

He hoped it could restore and increase the power capacity of the reservoir. Thus, during rainy season, it can minimize inundation in Tomang and its surrounding areas.

"It has been conducted since one week ago. Hopefully it can be finished in three months ahead," he finished.

Linked News
Popular News indeks
  1. Hosted in Sydney, Pramono Discusses Opening Australian Campuses in Jakarta

    access_time25-11-2026 remove_red_eye734 personDessy Suciati
  2. Pramono Pushes to Complete Long-Delayed Pluit JLNT by March 2027

    access_time20-11-2026 remove_red_eye726 personDessy Suciati
  3. JAF 2026 Highlights Maritime Heritage and Coastal Architecture

    access_time21-11-2026 remove_red_eye719 personAnita Karyati
  4. Jakarta Strengthens ASEAN Cooperation on Climate, Transport, and Youth

    access_time20-11-2026 remove_red_eye655 personFolmer
  5. BORJU Markets 200 Local Products

    access_time20-11-2026 remove_red_eye624 personAnita Karyati