You don't have javascript enabled. Good luck with that.
Pencarian
 Padat Lumpur, Waduk Rawa Kepa Dinormalisasi

Rawa Kepa Reservoir Normalized

The Rawa Kepa Reservoir that located at Jl Rawa Kepa V, Tomang Urban Village, Grogol Petamburan Sub-district, normalized. It is targeted to be complete in the upcoming December.

Mud already seen dries and strewn by wild grass and trees. It makes the reservoir narrow and slum

West Jakarta Water Management Sub-dept Head, imron Syahrin disclosed, the reservoir has 4,000 square meters wide. His sub-dept sent two excavators to dredge mud in the reservoir.

Gendong Cakung Drain River Normalized

"Mud already seen dries and strewn by wild grass and trees. It makes the reservoir narrow and slum," he expressed, Saturday (9/10).

He hoped it could restore and increase the power capacity of the reservoir. Thus, during rainy season, it can minimize inundation in Tomang and its surrounding areas.

"It has been conducted since one week ago. Hopefully it can be finished in three months ahead," he finished.

Linked News
Popular News indeks
  1. Temporary Crosswalk to Be Built at Tendean Pedestrian Bridge Site

    access_time18-07-2026 remove_red_eye1771 personFakhrizal Fakhri
  2. China-Based Training Equips PR Professionals and Journalists for Digital Media Transformation

    access_time19-07-2026 remove_red_eye1513 personFakhrizal Fakhri
  3. Jakarta Supports Social Media Restrictions for Children

    access_time20-07-2026 remove_red_eye1110 personFakhrizal Fakhri
  4. Rano Challenges Jakarta Provoke Organizers to Hold Exhibition Along Sudirman-Thamrin

    access_time18-07-2026 remove_red_eye1096 personBudhi Firmansyah Surapati
  5. Gas Stove Leak Sparks Fire, Gutting Five Rented Houses on Jalan Kayu Tinggi

    access_time17-07-2026 remove_red_eye1001 personNurito