You don't have javascript enabled. Good luck with that.
Pencarian
 Padat Lumpur, Waduk Rawa Kepa Dinormalisasi

Rawa Kepa Reservoir Normalized

The Rawa Kepa Reservoir that located at Jl Rawa Kepa V, Tomang Urban Village, Grogol Petamburan Sub-district, normalized. It is targeted to be complete in the upcoming December.

Mud already seen dries and strewn by wild grass and trees. It makes the reservoir narrow and slum

West Jakarta Water Management Sub-dept Head, imron Syahrin disclosed, the reservoir has 4,000 square meters wide. His sub-dept sent two excavators to dredge mud in the reservoir.

Gendong Cakung Drain River Normalized

"Mud already seen dries and strewn by wild grass and trees. It makes the reservoir narrow and slum," he expressed, Saturday (9/10).

He hoped it could restore and increase the power capacity of the reservoir. Thus, during rainy season, it can minimize inundation in Tomang and its surrounding areas.

"It has been conducted since one week ago. Hopefully it can be finished in three months ahead," he finished.

Linked News
Popular News indeks
  1. Jakarta Endorses New Housing Project for Residents on Railway Embankments

    access_time28-03-2026 remove_red_eye2388 personDessy Suciati
  2. Deputy Governor Watches Pelangi di Mars with Orphans

    access_time27-03-2026 remove_red_eye856 personTiyo Surya Sakti
  3. Pramono Calls for Enhanced Synergy at DPRD Post-Eid Gathering

    access_time30-03-2026 remove_red_eye675 personDessy Suciati
  4. Garbage Dump at Tanah Kusir Cemetery Officially Closed

    access_time27-03-2026 remove_red_eye537 personTiyo Surya Sakti
  5. Channel Normalization in Cempaka Putih Tengah to Complete May

    access_time27-03-2026 remove_red_eye509 personFolmer