Rawa Kepa Reservoir Normalized
access_time September 10 2016 05:11 PM remove_red_eye 1808
Reported by TP Moan Simanjuntak | Translated by Nugroho Adibrata
Reported by TP Moan Simanjuntak | Translated by Nugroho Adibrata
The Rawa Kepa Reservoir that located at Jl Rawa Kepa V, Tomang Urban Village, Grogol Petamburan Sub-district, normalized. It is targeted to be complete in the upcoming December.
Mud already seen dries and strewn by wild grass and trees. It makes the reservoir narrow and slum
West Jakarta Water Management Sub-dept Head, imron Syahrin disclosed, the reservoir has 4,000 square meters wide. His sub-dept sent two excavators to dredge mud in the reservoir.
Gendong Cakung Drain River Normalized"Mud already seen dries and strewn by wild grass and trees. It makes the reservoir narrow and slum," he expressed, Saturday (9/10).
He hoped it could restore and increase the power capacity of the reservoir. Thus, during rainy season, it can minimize inundation in Tomang and its surrounding areas.
"It has been conducted since one week ago. Hopefully it can be finished in three months ahead," he finished.