You don't have javascript enabled. Good luck with that.
Pencarian
 Padat Lumpur, Waduk Rawa Kepa Dinormalisasi

Rawa Kepa Reservoir Normalized

The Rawa Kepa Reservoir that located at Jl Rawa Kepa V, Tomang Urban Village, Grogol Petamburan Sub-district, normalized. It is targeted to be complete in the upcoming December.

Mud already seen dries and strewn by wild grass and trees. It makes the reservoir narrow and slum

West Jakarta Water Management Sub-dept Head, imron Syahrin disclosed, the reservoir has 4,000 square meters wide. His sub-dept sent two excavators to dredge mud in the reservoir.

Gendong Cakung Drain River Normalized

"Mud already seen dries and strewn by wild grass and trees. It makes the reservoir narrow and slum," he expressed, Saturday (9/10).

He hoped it could restore and increase the power capacity of the reservoir. Thus, during rainy season, it can minimize inundation in Tomang and its surrounding areas.

"It has been conducted since one week ago. Hopefully it can be finished in three months ahead," he finished.

Linked News
Popular News indeks
  1. Pram-Rano Attend Bung Karno Festival at Proklamasi Park

    access_time20-06-2026 remove_red_eye1091 personFolmer
  2. JIS-Ancol Integrated Infrastructure Officially Activated

    access_time23-06-2026 remove_red_eye575 personDessy Suciati
  3. Free Cake-Making Training Held at RPTRA Mustika Ratu

    access_time23-06-2026 remove_red_eye499 personNurito
  4. Metropolitan City Rally 2026 to Be Held at City Hall

    access_time19-06-2026 remove_red_eye479 personAldi Geri Lumban Tobing
  5. Rano Officially Opens Discover Betawi Art and Culture 2026

    access_time19-06-2026 remove_red_eye475 personBudhi Firmansyah Surapati