You don't have javascript enabled. Good luck with that.
Pencarian
Pengerukan Kali Pesanggrahan Mulai Dikerjakan

Pesanggrahan River Dredging Starts

The dredging of Pesanggrahan river or precisely beside Tanah Kusir cemetery, Kebayoran Lama is started by Water Body UPK, Jakarta Dept. of Cleanliness. One amphibious excavator is deployed.

Trash and mud are dredged from the river

“Trash and mud are dredged from the river,” said Irwan Herdiana, agency’s supervisor, Friday (9/16).

The dredging is run from Kampung Poncol Pesanggrahan up to Ulujami bridge, Cipulir. His side hopes the project will decrease the inundation at Cipulir.

Heavy Equipment Deployed to Pesanggrahan River

“River depth is vary from 1.5 meters to 2 meters. We’ll deep the river up to four meters,” he added.

The dredging was postponed since the heavy equipment must pass the private land. His side needs permit from the owner.

Linked News
Popular News indeks
  1. Rano Reaffirms Jakarta's Vision of Becoming a City of Cinema

    access_time22-10-2026 remove_red_eye5558 personBudhi Firmansyah Surapati
  2. Check Saturday's Traffic Diversions for Jakarta Running Festival

    access_time23-10-2026 remove_red_eye901 personAldi Geri Lumban Tobing
  3. MRT Jakarta Prolongs Weekend Service for Kanye West Concert

    access_time23-10-2026 remove_red_eye803 personAldi Geri Lumban Tobing
  4. MRT Jakarta Modifies Schedule for Jakarta Running Festival

    access_time23-10-2026 remove_red_eye779 personAldi Geri Lumban Tobing
  5. Jakarta–Turkey Film Production to Begin Filming in 2027

    access_time22-10-2026 remove_red_eye725 personBudhi Firmansyah Surapati